Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) TEMP SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PLAN - SUPPLEMENTAL CONTROLS MAY BE NEEDED BASED UPON HOW CURRENT CONTROLS PERFORM. 2) ENSURE YOU PERFORM REQ STORM WATER SELF INSPECTIONS PER YOUR PLAN. 3) ROUTINELY SWEEP UP TRACKED MATERIALS OFF SURROUNDING PUBLIC ROADWAYS. 4) INSTALL AND MAINTAIN A CONCRETE/MATERIALS WASH-OUT PER PLAN. 5) CALL FOR INSPECTION FOR ANY PROSOSED GRADING CHANGES, CONCERNS, AND/OR QUESTIONS. |