Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T09BU00892

Parcel: 140430130

Inspection Status: Approved

Inspection History: FIRE SPKLR - UG, PIPING, HYDRO

Permit Number - T09BU00892

Inspection Description - FIRE SPKLR - UG, PIPING, HYDRO

Inspection Status - Approved

Date Description Inspector Results Comments
07/23/2009 FIRE SPKLR - UG, PIPING, HYDRO Approved Piping was covered except for 90's and the T's leading to hydrants. Pressure holding @ 98psi. after 2 hrs.
07/17/2009 FIRE SPKLR - UG, PIPING, HYDRO Denied Today 0n 7/17/2009 100 PSI testing done witness at 9:00am and re-inspected at 11:30 AM no leaks at this time.
On 07/15/2009 200 PSI test was done and piping failed came apart on joint, not enough center loading and thrust blocking on northeast end at 90 gave way. Re-pour thrust blocking on northeast 90 and fill to top for center loading keeping all joints clear for 200 PSI test on 07/22/2009. (Jeff 419-1638)
06/22/2009 FIRE SPKLR - UG, PIPING, HYDRO Partial Approval