Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/27/2017 | STORMWATER FOLLOW-UP INSP | Approved | ||
09/06/2016 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
06/17/2016 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
05/03/2016 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGE FROM LAST INSPECTION. TRACK OUT ON STREETS NO REPAIRS TO CONTROLS. | |
04/28/2016 | STORMWATER FOLLOW-UP INSP | Continued | CALLED GC ABOUT SWPPP CONTROLS REPAIRS. | |
07/10/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
05/22/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
05/06/2013 | STORMWATER FOLLOW-UP INSP | Continued | CONCRETE WASH OUT AREA AND WASH OUT HAVE BEEN CLEANED. | |
05/01/2013 | STORMWATER FOLLOW-UP INSP | Continued | GOT WITH GC TO CLEAN WASH OUTS AND AREA AROUND WASH OUT. | |
04/09/2013 | STORMWATER FOLLOW-UP INSP | Continued | CONTROLS HAVE BEEN REPAIRED. | |
04/04/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGE FROM LAST INSPECTION. | |
04/04/2013 | STORMWATER FOLLOW-UP INSP | Continued | STILL NEED TO DO REPAIRS. | |
04/04/2013 | STORMWATER FOLLOW-UP INSP | Continued | ||
04/02/2013 | STORMWATER FOLLOW-UP INSP | Continued | GOT WITH GC ABOUT CLEAN UP AROUND WASH OUT AND REPAIR SWPPP CONTROLS. | |
03/27/2013 | STORMWATER FOLLOW-UP INSP | Continued | WASH OUT LOOKS OK NO TRACK OUT AT THIS TIME. | |
01/03/2013 | STORMWATER FOLLOW-UP INSP | Continued | WORKING ON HOUSE PADS. NO TRACK OUT AT THIS TIME. | |
07/27/2012 | STORMWATER FOLLOW-UP INSP | Continued | ASKED THAT THE CONTRACTORS PERSONNEL INFORM THE SUPERVISOR FOR THIS SITE BOB MALLORY THAT THEY NEED TO ADD SOME ADDITIONAL WADDLE IN THE NORTH EAST QUADRANT OF THIS SITE TO ENSURE PROTECTION OF THE INLET INTO THE BASIN LOCATED AT THE NORTH EAST CORNER OF THIS SITE. | |
07/26/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS NOTED AT THIS TIME. | |
07/20/2012 | STORMWATER FOLLOW-UP INSP | Continued | BOB MALLORY WORKING ON INSTALLING SWPPP CONTROLS. CALLING FOR PRE-CON BEFORE STARTING GRADING WORK. | |
07/26/2011 | STORMWATER FOLLOW-UP INSP | Continued | CLEANING STREETS ON SITE. | |
05/18/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY. | |
03/03/2011 | STORMWATER FOLLOW-UP INSP | Continued | proide approved stormwater controls . per list from 9-22-2010 that malena make. | |
07/19/2010 | STORMWATER FOLLOW-UP INSP | Correction Required | CHECK STORMWATER CONTROLS AFTER RAINEVENT OF 7/18/10. BASINS WILL NEED TO BE ADDRESSED BEFORE FINAL RELEASE, MAJOR EROSION AT THE WESTERN MOST INLET FOR DRAINAGE CHANNEL AT THE CENTER OF THE DEVELOPMENT. LARGE AMOUNTS OF SILT ON THE ROADWAYS AT THE CENTER OF THE DEVELOPMENT. STOCKPILES HAVE NOT BEEN STABILIZED. PICTURES TO BE ATTACHED TO THIS RECORD. |
|
06/15/2009 | STORMWATER FOLLOW-UP INSP | Not Applicable | ONGOING DIRT WORK. STORM CONTROLS IN PLACE. |