Permit: T08PL01244

Parcel: 133033000


Addresses:

9855 E SPEEDWAY BL


Inspection Status: Approved

Inspection History: PLUMBING - YARD WTR LINE/TEST

Permit Number - T08PL01244

Inspection Description - PLUMBING - YARD WTR LINE/TEST

Inspection Status - Approved

Date Description Inspector Results Comments
12/23/2009 PLUMBING - YARD WTR LINE/TEST Approved IVRS - Inspection :*
12/22/2009 PLUMBING - YARD WTR LINE/TEST Partial Approval IVRS - Inspection :*
1) ENIGINEER PROVIDE MANUFACTURE DOCUMENTATION FOR THE USE OF MEGA LUG FITTINGS WITH SCHEDULE 40 PVC PIPE
2) NEED STERILIZATION FOR FINAL APPROVAL
12/21/2009 PLUMBING - YARD WTR LINE/TEST Partial Approval IVRS - Inspection :*
1) 4" RP AND CONNECTION TO PIPING OK
12/07/2009 PLUMBING - YARD WTR LINE/TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
10/02/2009 PLUMBING - YARD WTR LINE/TEST Partial Approval IVRS - Inspection :*
1) WATER DISTRIBUTION FROM STUB UP AT METER LOCATION TO STUB UPS AT BLDGS. 100 PSI TEST OK
2) NEED TO SEE BLDG CONNECTIONS AND METER THRU RPB TIE IN
09/30/2009 PLUMBING - YARD WTR LINE/TEST Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
09/29/2009 PLUMBING - YARD WTR LINE/TEST Not ready for Inspection IVRS - Inspection :*
09/28/2009 PLUMBING - YARD WTR LINE/TEST Partial Approval IVRS - Inspection :*
1) 100 PSI TEST FROM RISER AT DOWN STREAM SIDE OF METER (FUTURE INSTALL) THRU PER PLAN, REPAIR LEAK AT POOL EQUIPMENT. PROVIDE FITTING FOR CHANGE OF DIRECTION AT BLDG 8 & 9 AREA
2) STERILIZATION AND BACTERIA REPORT AT FUTURE
09/17/2009 PLUMBING - YARD WTR LINE/TEST Not ready for Inspection NOT READY AT THIS TIME.
MEGA LUGS FOR USE W/SCH? TO PVC YARD LINE IS OK FOR LETTER FROM GEOFF HARRIS P.E. FOR THIS PROJECT
PROVIDE TORQUE SPECIFICATIONS
08/19/2009 PLUMBING - YARD WTR LINE/TEST Not ready for Inspection IVRS - Inspection :*
1) ALL PIPING REQUIRES TEST PRIOR TO COVER
2) ALL PIPING SHALL BE CONTINOUSLY SUPPORTED
3) MEGA LUGS MAY NOT BE APPROVED FOR SCHEDULE 40
4) PROVIDE CODE LISTING AND INSTALLATION INSTRUCTIONS