Inspection History Details
Inspection Status: Denied
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2008 | FIRE - FINAL | Denied | Not approved 11/18/08. 1.) Provide a sign over main exit that reads,"DOOR SHALL REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED' 2.) Remove the pad lock from the front door. 3.) Provide cover plates for all open juntion boxes. 4.) All permanent electrical wiring shall be installed according to the electrical code. a.) open wiring b.) exposed ROMEX wiring up to 7 ft. shall be protected in conduit. 5.) Accumulation of stored materials in the hot water heater area shall be cleared. 6.) Remove the double-cylinder lock from the rear wrought iron security door. 7.) Remove the security bar from the rear exit door. 8.) Extension cords are for temporary use only, not a substitute for permanent wiring. 9.) Need to provide approved plans for the business. 10.) Need to provide approved plans for the addition of the back room and for the addition of the large walk-in cooler. |