Case: T08FR04414

Parcel: 11626273E


Addresses:

41 S SHANNON RD

Inspection Status: Violation

Inspection History: VIOL - FIRE PROTECTION SYSTEMS

Date Description Inspector Results Comments
11/24/2008 VIOL - FIRE PROTECTION SYSTEMS Violation Buildings #1, #5, #7, #8, #9, #10, #12, #13, #16, #18, #24, and #25 The spare head box needs a head wrench For Central 2000 LF and GB sprinkler heads.
11/24/2008 VIOL - FIRE PROTECTION SYSTEMS Violation Building #18 - Sprinkler head in riser room apperas to have plaster on it.
11/24/2008 VIOL - FIRE PROTECTION SYSTEMS Violation Appartment 20102 - The washer/dryer closet has a sprinkler head with plaster on it.
11/24/2008 VIOL - FIRE PROTECTION SYSTEMS Violation Bldg #22 Unit #22205 - The sprinkler head at top of the stairs has been replaced with a sidewall sprinkler head on the ceiling in place of a pendant head.
11/24/2008 VIOL - FIRE PROTECTION SYSTEMS Violation the spare head boxes need additional spare sprinkler heads as follows:
All buildings - 2 upright heads
Bldg #5 - 2 sidewall heads.
Bldg #7 - 1 sidewall head.
Bldg #10 - 2 sidewall and 2 pendant heads.
Bldg #15 - 1 pendant head.
Bldg #16 - 2 pendant heads.
Bldg #18 - 2 pendant heads.
Bldg #20 - 2 pendant heads.
Bldg #24 - 2 pendant heads.
11/24/2008 VIOL - FIRE PROTECTION SYSTEMS Violation A copy of the deficiency report is attached, a reinspection will be done 12-08-08