Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - ADMINISTRATION
Plan Number - T08FR02237
Inspection Description - VIOL - ADMINISTRATION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/01/2008 | VIOL - ADMINISTRATION | Approved | petition of appeal to the fire chief on 09/21/04 draperies/trim shall be flame retardent. Approved on 10/15/2004- TFC requires that places of assembly maintain documentation that materials, such as the draperies are made of flame resistent materials. The inspection process during the construction of the facility would have required verification of the flame resistant material used in the draperies, prior to receiving a C of O. Because there is no indication that the draperies have been replaced, Chief will accept that the material is in compliance. |