Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Correction Required
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
| Date |
Description |
Inspector |
Results |
Comments |
| 02/15/2008 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
TFC 605.1 Abatement of electrical hazards. Repair the leaks in the roof so water cannot flow into the electrical service equipment. |
| 02/15/2008 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
TFC 605.6- Provide blanks for all open spaces in the electrical panels. |
| 02/15/2008 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
TFC 605.3 No storage of any materials shall be located within 36 inches of electrical service equipment. |
| 02/15/2008 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
TFC 605.1- Remove all moisture from the electrical service panels and have all electrical systems checked by an electrical contractor. |