Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/23/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE A CHLORINE REPORT FOR STERILIZATION OF POTABLE WATER SYSTEM 2. COMPLETE INSULATION ON HOT WATER PIPING 3. PROVIDE 1" AIR GAP AT T&P FROM WATER HEATER 4. MAKE ALL FIXTURES WATER TIGHT AND FUNCTIONAL 5. WATER HEATER CANNOT BE SOLE CONTROL OF HOT WATER TEMPERATURE NOT TO EXCEED 110 DEG. AT PUBLIC USE LAVS 6. EXPOSE FOOT VENT CLEANOUT FOR SK-3 SINK |