Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2009 | ENGINEERING - FINAL | Approved | ||
| 01/27/2009 | ENGINEERING - FINAL | Partial Approval | Contractor needs to: 1- Close out grading permit. 2- Remove port-a-potty from site. 3- Install wheel stops in parking area, north side of building. 4- Paint bollards in trash enclosure. 5- Provide pilot holes to hold trash enclosure doors in open position. 6- Clean street northside of building. 7- Stabilize all areas disturbed by construction. 8- Complete all work inside building. 9- Provide engineers cert for site. Per C.O.T. drainage manaul XIV. |