Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/21/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* INSTALL PER APPROVED PLAN |
|
| 10/01/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* PER REDLINE ON SITE FOR ADDITION OF CUP SINK WHICH WILL REQUIRE A REVISED CITY APPROVED PLAN FOR FINAL. INSTALLATION IS COMPLETE. RECEIVE BACTERIA REPORT FOR POTABLE WATER. |
|
| 09/26/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* BACTERIA REPORT FOR POTABLE WATER ON SITE. ICE MACHINE WILL REQUIRE REVISED CITY APPROVED PLAN FOR CORRECT TERMINATION OF BOTH DRAINS TO APPROVED RECEPTOR. FOR FINAL APPROVAL WITH CORRECT INSTALLATION. |
|
| 09/25/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. MAKE MOP SINK WATER TIGHT (CAULK) 2. ICE MAKER REQUIRES RIDGID DRAINS (2) OF APPROVED MATERIAL TO APPROVED DRAINAGE RECEPTOR 3. R.O SYSTEM MAY NOT HAVE A DIRECT CONNECTION BETWEEN WATER AND SANITARY DRAINAGE PIPING WITHOUT AN APPROVED LISTING. |