Permit: T08CM01711

Parcel: 11105063J

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
01/30/2009 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
LOADING AREA RAMP -- OK TO POUR
01/14/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
PRE-GROUT OK
01/13/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SITE WALL @ 0'-4' -- APPROX. 140'
SOUTH & SW - W PORTIONS OF SITE -- OK TO GROUT
12/31/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) SITE WALL
12/30/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) MISSING CONTROL JOINTS REBAR
11/10/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SLAB FOR MAIN BUILDING REMOVED -- RESET REBAR AS
PER RFI #SK3 10/30/08 -- OK TO POUR SOUTH HALF TO
BE POURED FIRST -- SPECIAL INSPECTED
10/14/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
10/09/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) RESTROOM AREAS AT E/7.25-8, F/5/7.25-8
2) OK TO POUR FOOTINGS
3) RESTROOM SLAB TO CONTROL JOINTS E/7.25-8, F5/7.25-8 OK TO POUR
10/08/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
TOE DOWN FOOTING LINE G/1-8; COLUMN FOOTING @ LINE F.5/7.5 -- OK TO POUR PROGRESS AREAS
10/07/2008 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - RI canceled
10/01/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS PERIMETER FOOTINGS LINES A/1 TO G/1, A/1 TO A/8, A/8 TO G/8 (F3-3, F6-6) OK TO POUR
09/19/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONCRETE GRADE BEAMS @ LINES 2,6,7 AS PER GB SCHEDULE
PAGE S200 -- OK TO POUR
09/17/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONCRETE GRADE BEAMS @ LINES 3, 4, 5 -- AS PER GB SCHEDULE, PAGE S200 -- OK TO POUR PROGRESS AREAS
09/12/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
6 @ COLUMN FOOTINGS (F-3's) @ SOUTH SIDE - OK TO POUR AS PER FOOTING SCHEDULE
09/11/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NORTH SIDE COLUMN FOOTINGS - LINE 1/A, C, D, E, F, G
(8 @ F3's)
EAST SIDE LINE A/2-7 (F6 @ 6) OK TO POUR PROGRESS AREAS
DETAIL #402
09/10/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
2 @ COLUMN FOOTINGS (F6) - LINE G/6-7
OK TO POUR
09/09/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 @ F6 - LINE G/2-5 AS PER DETAIL #405, PAGE S400
COLUMN FOOTINGS - OK TO POUR