Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :$ INSPECTION PER REDLINES PP MP-1 1. 3/4" CU HOT & COLD WATER ABOVE CEILING TEST OK SUPPORTS OK. PIPE INSIDE WALLS PREVIOUSLY COVERED APPEARS OK FROM TOP 2. ABS DRAIN TESTED FROM C.O THROUGH ROOF TEST OK 3. MUST SUPPORT 2" ABS 4' O.C MAX ABOVE CEILING PLEASE LEAVE TILES OUT OF CEILING ALONG SOUTH WALL BEHIND COUNTER FOR FUTURE VERIFICATION 4. REDLINES MUST BE APPROVED AS REVISION BEFORE FINAL |
|
| 06/11/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | 1. WALLS COVERED WITHOUT INSPECTION 2. HOT WATER PIPING TO BE INSULATED 3. ALL PIPING TO BE TESTED CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE |