Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/01/2009 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* PROVIDE CORRECT WATER CONN. TO SOAP DISPENSER AT MS A VACUUM BREAKER MAY NOT HAVE VALVES DNSTREAM SECURE STOVE SO THAT NO STRAIN IS PLACED ON FLEX STERILIZATION AND BACKFLOW CERTS ARE ALL OK |
|
| 05/28/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
| 05/22/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* C O IN WALL OK TO COVER |
|
| 05/21/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) DISPOSER CONNECTION IS OK 2) INSTALL CLEANOUT FOR HAND SINKS 3) NEED TO SEE PLAN REVISION FOR FINAL 4) REPLACE DAMAGED CLEANOUT PLUGS WITH PLUGS MADE AND LISTED TO RECEIEVE A SCREW 5) SEAL THREADS 6) 1" AG ABOVE FLOOD LEVEL REQUIRED FOR INDIRECT WASTE 7) NOTE: WATER SYSTEM STERILIZATION IS REQUIRED 8) CONNECT CW TO EXISTING UP STREAM OF CHECK VALVE/SUPPLY TO BOILER |
|
| 05/18/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. GAS TEST OK 2. MAKE FINAL CONN. 3. INSTALL SEDIMENT TRAP AND RESTRAINT 4. PROVIDE MIXING VALVE AND EXP. TANK AT EXISTING BOILER 5. PROVIDE TYPE L COPPER FOR COOLER SUPPLY 6. SUPPORT. TEST. 7. PLUG AND INSTALL GRATE ON UNUSED FS 8. ONLY ONE SLIP NUT ALLOWED DNSTRM OF P-TRAP 9. PROVIDE PROPER MAKE UP ON SOLVENT WELD FITTINGS 10. PROVIDE PROPER DRAINAGE FITTING ON VENT TAKE OFF 11. PROVIDE A DIRECT CONNECTION FOR DISPOSER 12. PROVIDE ACCESS TO RELIEF VALVE ON BOOSTER. CORRECT DRIP. 13. PROVIDE ACCESS TO 0075 (ROTATE) INSTALL UNION P-TRAP REQUIRED ON INDIRECT WASTE OVER 5' 14. SUPPORT AND CORRECT SLOPE 15. HAND SINK AT BEV COUNTER (FRONT) REQUIRES A DIRECT DRAIN CONNECTION AND A PLAN REVISION FOR WATER & WASTE 16. HB VAC BREAKER |