Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 03/18/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
| 03/09/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 11/19/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1. PROVIDE A TEST ON DWV 2. PROVIDE AN APPROVED DOUBLE FIXTURE FITTING PER UPC 704 AT LAVS 3. SUPPORT AND PROTECT ABS PASSING THRU METAL STUDS 4. SUPPORT AND ISOLATE ALL COPPER 5. HOT WATER PIPING NOT PER PLAN 6. PROVIDE CLEARANCE AROUND HW AND HWR PIPING FOR 1" INSULATION. WIPE CLEAN ALL FLUX. SEE INSTALLATION STANDARDS IS #3 7. CHECK YOUR LAYOUT AT VENTS FOR 3-COMP SINK 8. NOTE: BOILER IS MISSING AN EXPANSION TANK |
|
| 11/13/2008 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |