Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2009 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 04/27/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 04/23/2009 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/23/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* PIPE INSULATION AND CLAMPS OK TO COVER RECALL 03035 FOR CLOSET FLANGE INSP. AFTR. FINISH FLOOR |
|
| 03/19/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* TESTING COMPLETE INSULATION NOT YET COMPLETE - RECALL CLETE @ 480-567-6395 |
|
| 03/18/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CORRECT CLEANOUT AT K-10 AND M CU CORRECT SWEEP 3-COMP SINK BELOW FLOOR CHANGE OK 2" GAS DROP IN WALL OK |
|
| 03/17/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 03/09/2009 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEW FIXTURE NOT INSTALLED PER PLAN AND VIOLATES UPC 908.2 BECAUSE OF T 7-5 NOTE #2 2. WATER PIPE SIZING OK STILL NEED TO PROVIDE A CLEARANCE FOR PIPE - INSULATION SPECIFIED |
|
| 11/19/2008 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 11/13/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* POST CORRECT ADDRESS AT REAR DOOR 1. SECURE/SUPPORT PIPING T3-2 2. INSTALL BACKING FIXTURE CARRIERS SPECIFIED 3. PROVIDE TEST 4. SWEEPS REQUIRED ON HORIZ. TRAP ARMS 5. DRAINAGE FITTING REQUIRED ON GT VENT 6. TAKE OFF AT 45 DEG's 7. NO PLASTIC EXPOSED TO SUNLIGHT 8. PROVIDE LISTING FOR INSTALLATION OF ANSUL VALVE ABV ROOF 9. PROVIDE 2 1/2" TEE PER PLAN 10. PROVIDE VENTS FOR FLOW CONTROL AND P-TRAP AT 3-COMP SINK. SEE ILLUSTRATION AND CODE SEC. 1014.2.1 11. WATER NOT YET COMPLETE. PROVIDE CLEARANCE FOR PIPE INSULATION. REAM ALL COPPER JOINTS AND REMOVE EXCESS FLUX. LIST MAY NOT BE COMPLETE. |