Permit: T08CM01024

Parcel: 116206290

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T08CM01024

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
04/25/2011 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
01/31/2011 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1) PROVIDE APPROVED SUPPORT ON ALL PIPING FOR SOLAR WATER HEATER
2) COMPLETE INSTALL OF BACKWATER VALVES
3) MAKE ALL CLEANOUTS WATER AND GAS TIGHT
4) CALL ALL ACTIVITY FOR HISTORY
5) LIST MAY NOT BE COMPLETE
04/01/2009 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
DRY WELL FOR WATER COOLER PER REDLINE TO BE APPROVED BY CITY OF TUCSON - UNDERGROUND OK 2' PVC AND 1/2 COPPER
11/12/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
NEW 2" GREASE WASTE AND 3" WASTE #113 VENDOR
AND #112 - 3" NEW WASTE TEST OK
08/14/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
TEST ON 6" PVC FROM STAIRWELL NOT PER PLAN TEST ON INSTALL PER PLAN
07/25/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST 4" FLOOR DRAIN IN TRASH ROOM PER REDLINE PAGE P1 INITIAL
07/23/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. UNDERGROUND PVC FOR PUBLIC RESTROOMS OK
2. 2" MOP SINK TIED INTO G.W OK
WATER TEST OK
OK TO COVER
06/12/2008 PLUMBING - ROUGH, SOIL Partial Approval 1. 2 - 4" VENTS ADDED DOWNSTREAM OF BACKWATER VALVES
2. INTERCEPTOR INSTALLED OK - OK TO COVER
3. OK TO COVER SEWER P.O.C AT RESTROOMS #106 & #108
06/06/2008 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
BUILDING SEWER DOWNSTREAM OF BACKWATER VALVE TO BE VENTED PER 904.1 2006 UPC
05/30/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
PER HIGHLIGHT ON P-1
05/28/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
PER HIGHLIGHTER ON PAGE P-1
05/27/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. FROM A+ TO 4.5 GREASE TRAP PIPING TEST OK
2. 4.5 TO 8 TEST OK
05/23/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4" GW FOR EAST SECTION PER INITIAL P.1 WATER TEST OK
05/22/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) PER HIGHLIGHT ON PAGE P-1