Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T08CM00643
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/04/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* OK TO COVER UNDERGROUND OK TO COVER INTERCEPTOR OK TO COVER SEWER CONNECTION TO P.O.C |
|
06/02/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. OK TO POUR INSIDE 2. VENT FITTINGS ARE TO OPEN IN THE DIRECTION OF FLOW YOU MAY COVER THE REST. |
|
05/30/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. PROVIDE APPROVED HEALTH DEPT. PLAN -- HAND SINK LOCATION ARE DETERMINED BY THEM 2. OK TO COVER, SUBJECT TO HEALTH DEPT APPROVAL OF RELOCATION 3. CALL 03005 FOR PRE-POUR |
|
05/28/2008 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. VERTICAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP 2. VENT THE FIXTURE TRAP NOT THE DRAIN LINE 3. WHERE A VENT CONNECTS TO A HORIZONTAL DRAIN IT SHALL HAVE ITS INVERT TAKEN OFF ABOVE THE DRAINAGE CENTER LINE DOWNSTREAM OF THE TRAP BEING SERVED 4. CONTRACTOR TO PAY A REINSPECTION FEE |
|
05/27/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE 2. EACH FIXTURE TRAP TO HAVE A CONNECTING VENT DOWNSTREAM OF THE TRAP BEING SERVED 3. HORIZONTAL VENTING BELOW FLOOD RIM ONLY PERMITTED FOR STRUCTURAL CONDITIONS 4. NO HUB BAND NOT PERMITTED ON ABS 5. NOTE: AT GREASE INTERCEPTOR, ABS AND PVC MAY NOT BE INTERMINGLED. |
|
05/23/2008 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. REDLINE CHANGES PRIOR TO INSP. 2. FULL SIZE CO's NEEDED 3. VENT TAKE-OFF SHALL BE ABV. FLOW LINE 45 DEG. MIN. 4. ALL FIXTURES REQUIRE A VENT SHADE, PROVIDE 1/4" SLOPE |