Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2009 | PLUMBING - FINAL | Approved | 1) HANGERS TO BE INSTALLED WITHIN 18" EACH SIDE OF THE COUPLING 2) EXTEND VENT AT ELEVATOR SHAFT TO ABOVE PARAPET 3) HANGER MAY NOT BE INSTALLED ON COUPLING 4) RAISE CLEANOUTS HALF BURRIED IN ASPHALT 5) FLASH SYSTEM AND BREAK OFF RETAINING SCREW AT HOSE BIBBS 6) PROVIDE BACKFLOW CERT FOR RPPBP |
|
| 09/23/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOT TO CALLING FINAL |