Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2009 | FIRE SPKLR - FINAL | Approved | ||
| 11/06/2008 | FIRE SPKLR - FINAL | Partial Approval | Phase#4 room 120 Adjust sprinkler heads to 1 inch below drop ceciling |
|
| 09/16/2008 | FIRE SPKLR - FINAL | Partial Approval | Phase 3 Approved | |
| 08/11/2008 | FIRE SPKLR - FINAL | Partial Approval | Phase #3 Rm. 103 Approved, still need to remove plastic piping used for ventilation above ceiling. Above ceiling is a non-combustible area. | |
| 08/05/2008 | FIRE SPKLR - FINAL | Partial Approval | Phase #5 Northeast wall correct coverage and northwest entrance correct coverage | |
| 07/30/2008 | FIRE SPKLR - FINAL | Partial Approval | ROOM #109 APPROVED (SUPER # 481-4745) | |
| 07/08/2008 | FIRE SPKLR - FINAL | Partial Approval | Ok for phase 1 only. Need up to date fire sprinkler inspection done, last inspection on file is 05/11/04. Thsi done yearly. Need a 5 year alarm check valve inspection done. This is done every 5 years, nothing on file for the last time this was done. In room #132 need to correct sprinkler coverage. Can not use small room rule head is 11" off wall. |