Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/30/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE #4 WIRE FOR BONDING GAS SYSTEM 2. PROVIDE APPROVED T&P DRAIN MATERIAL (CPVC, COPPER, GALVANIZED METAL PIPE) |
|
| 02/28/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE ROOF FLASHINGS FOR PIPE PENETRATIONS THRU ROOF 2. SEE NOTES #3, #5, #6 FROM 12/12/07 3. ORIENT PIPING IN WATER HEATER AREA TO PROVIDE PULL SPACE FOR WATER HEATER 4. EXTEND VENT FROM FURNACE TO 3' ABOVE TOP OF AIR INTAKE WITH DOUBLE WALL VENT PIPING 5. PROVIDE BONDING OF BUILDING GAS PIPING |
|
| 12/12/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE MINIMUM 10 PSI TEST USING TEST GAUGE IN 1/10 POUND INCREMENTS WITH NO LOSS OF PRESSURE FOR 15 MINUTES IN PLACE AT REINSPECTION 2. PROVIDE ACCESS TO ROOF FOR INSPECTION 3. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN 4. PROVIDE CORRECT SUPPORTS & SECURE ALL PIPING PROPERLY 5. REMOVE TAPE FROM WATER HEATER VENT PIPING, NOTE: THIS PIPING SHALL MEET REQUIREMENTS FOR 2006 UPC 6. SHALL PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO FURNACE AND WATER HEATER 7. SHALL PROVIDE RIDGID NIPPLE THRU APPLIANCE HOUSING AT FURNACE LIST MAY NOT BE COMPLETE |