Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07PL01410

Parcel: 116010720

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
08/10/2007 PLUMBING - FINAL Approved IVRS - Inspection :*
1) CONTRACTOR HAS CUT IN/REPLACED TWO WAY CLEANOUT AT THE PROPERTY LINE AND AT THE HOUSE
2) OK TO COVER
3) PLUMBER PLEASE NOTE FOR FUTURE REFERENCE: CLEANOUTS ARE TO OPEN IN THE DIRECTION OF THE FLOW. THE ONLY PLACE YOU CAN HAVE A CLEANOUT INSTALLED AGAINST FLOW IS AT THE TWO WAY CLEANOUT, WHERE THE BLDG DRAIN CONNECTS TO THE BLDG SEWER