Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CONTRACTOR HAS CUT IN/REPLACED TWO WAY CLEANOUT AT THE PROPERTY LINE AND AT THE HOUSE 2) OK TO COVER 3) PLUMBER PLEASE NOTE FOR FUTURE REFERENCE: CLEANOUTS ARE TO OPEN IN THE DIRECTION OF THE FLOW. THE ONLY PLACE YOU CAN HAVE A CLEANOUT INSTALLED AGAINST FLOW IS AT THE TWO WAY CLEANOUT, WHERE THE BLDG DRAIN CONNECTS TO THE BLDG SEWER |