Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07PL01279

Parcel: 136283440


Addresses:

7676 E PECAN ST

Inspection Status: Not ready for Inspection

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
08/07/2007 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. PROVIDE BONDING OF BUILDING GAS PIPING #4 SOLID COPPER WIRE (2) CLAMPS
2. VENT FROM FURNACE TO BE EXTENDED UP WITH FULL SIZE DOUBLE WALL VENT PIPING TO 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF INTAKE
3. REMOVE DRYWALL FROM LOWER COMBUSTION AIR INTAKE BY DOOR OF WATER HEATER ROOM
4. SUPPORT GAS PIPING TO WATER HEATER