Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/29/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL HAVE TEST ON ENTIRE GAS SYSTEM AT TIME OF INSPECTION TEST SHALL HOLD WITH NO LOSS OF PRESSURE. 2. SHALL PROVIDE RIDGID NIPPLE THRU APPLIANCE HOUSING AT FURNACE. 3. REMOVE TAPE AT SINGLE TO DOUBLE WALL VENT CONNECTION AT FURNACE & PROVIDE 3-GALV SCREWS AT EACH JOINT. 4. MAKE UP VENT CORRECTLY AT WATER HEATER AND PROVIDE 3-GALV SCREWS AT EACH JOINT OF VENT PIPING. 5. PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO FURNACE AND WATER HEATER. 6. PROVIDE BONDING OF BUILDING GAS PIPING. 7. PROVIDE WORKABLE AGA OR CSA GAS VALVES AT APPLIANCES. |