Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2008 | VIOL - BUILDING SVCS & SYSTEMS | Approved | all items corrected | |
| 12/27/2007 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | 605.6 Unapproved conditions. Open junction boxes and open witing splices shall be prohibited. Approved covers shall be provided for all switches and outlet covers. ___ Provide covers for outlet by main entrance and junction box in ceiling of back office. |
|
| 12/27/2007 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | 605.5 Extension cords. Extension cords and flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors, or under doors or floor coverings, nor shall such cords be subject to environmental damage or physical impact. Extension cords shall be used only with portable appliances. ___ Remove extension cords. |
|
| 12/27/2007 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | 605.3 Working space and clearance. A working space of not less than 30 inches in width, 36 inches in depth, and 78 inches in height shall be provided in front o f electrical service equipment. Where the service equipment i swider than 30 inches, working space shall be no less than the width og the equipment. No storage of any kind shall be located within the designated working space. ___ Clear access to panel in storage shed. |