Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Approved
Inspection History: VIOL - FLAMMABLE LIQUIDS
| Date |
Description |
Inspector |
Results |
Comments |
| 06/07/2007 |
VIOL - FLAMMABLE LIQUIDS |
|
Approved |
Tanks were inerted to less than 5% O2 with dry ice. The two 1000 gallon union distributors tanks were removed. |
| 02/12/2007 |
VIOL - FLAMMABLE LIQUIDS |
|
Violation |
UFC 3404.2.14.1- Removal. Prior to removing these tanks, a permit shall be obtained. They shall be pumped out (empty) and purged before transporting. Tank openings shall be capped or plugged, leaving a .125 inch to .250 inch diameter opening for pressure equalization. They shall be transported appropriately. |