Inspection Status: Continued
Inspection History: INSP - AST/UST
| Date |
Description |
Inspector |
Results |
Comments |
| 06/07/2007 |
INSP - AST/UST |
|
Continued |
Paul Sudweeks 702-208-0475 |
| 05/21/2007 |
INSP - AST/UST |
|
Continued |
Site visit. Paul Sudweeks is continuing with the permit process. The tanks are installed and the emergency stop was tested with the unleaded gas tank. Tanks were allowed to be fueled for callibration of their dispensing equipment. |
| 02/06/2007 |
INSP - AST/UST |
|
Correction Required |
Site investigation- found 2 x 1000 ASTs (1 diesel, 1 unleaded) that are non-permitted. Light plant needs to be moved 20' away. Tanks were delivered by Union Distributing. We met with Paul Sudweeks to discuss permit process for ASTs that are in transit. They will be installing a 10K and 4K for diesel and a 2K for unleaded. We looked at a trailor that was fabricated for their Class III-B liquids, no emergency venting. |