Inspection History Details
Inspection Status: Cancelled
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2007 | ELECTRIC - FINAL | Cancelled | IVRS - RI canceled | |
| 06/14/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 05/29/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) CALL FOR FINAL ONCE ENERGIZED |
|
| 05/24/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. 250.32 OF NEC REQUIRES A GROUNDING CONDUCTOR TO BE INSTALLED WITH NEW FEEDERS. 2. BONDING JUMPER STILL NOT SIZED PROPERLY ON SERVICE RISER SHOULD BE 1/0 COPPER 3. WATER BOND TO BE SIZED 250.104 SHOULD BE 1/0 COPPER IF RUN TO 400 AMP SERVICE. IF INSTALLED TO PANEL SERVING HOUSE CAN BE SIZED PER 250.104(2) |
|
| 04/19/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED TO PULL GROUND WIRE #4 TO SERVICE AT NEW BUILDING PER DRAWINGS E-1 & NEC 250.32 2. HAVE ENGINEER SPECIFY COPPER OR ALUMINUM FOR NEW FEEDERS. 3. DRAWING E-1 CALLS FOR 1/0 CU TO WTR BOND PER NEC 250.104 4. DRAWING CALLS FOR GROUND RODS TO BE 8' APART 5. BONDING JUMPER ON SERVICE RISER TO BE SIZED PER NEC 250.102 (C) 6. DRAWING E-1 CALLS FOR 2 GROUND RODS 8' APART AT 2ND BUILDING. 7. CHECK DEPTH OF 2 1/2" PVC MIN TO BE 18" TO TOP OF PIPE PER NEC 300.5 |