Case: T07DV06792

Parcel: 136260020


Addresses:

3200 S MANN AV #V


Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Case Number - T07DV06792

Inspection Description - INSP - INITIAL CODE ENFORCMENT

Inspection Status - Approved

Date Description Inspector Results Comments
07/23/2007 INSP - INITIAL CODE ENFORCMENT Approved VISITED SITE, CONTACTED MANAGER WHO MENTIONED SHE WOULD HAVE MAINTENANCE PERSON MEET US AT THE PROPERTY AND ALLOW ENTRY. CINDY MENTIONED THAT RINCON ROOFING DOES ALL OF THEIR ROOFING IN THIS COMPLEX, THAT THEY HAVE ALREADY BEEN CONTACTED ON TWO OTHER UNITS, THIS UNIT BEING THE 3RD. CINDY MENTIONED RINCON WAS CONTACTED 1ST THING 7/23., THEY NEED TO COME OUT AND LOOK AT THE JON, GIVE THEM A BID (TIHIN 24 HRS), THEY GET THE OK TO DO THE WORK AND RINCON IS THEN SENT OUT. CINDY MENTIONED THAT BECAUSE OF THE RAIN- ROOFERS ARE BACKED UP (THIS IS TYPICAL) AND THEY WAIT UNTIL WORK CAN GET DONE. MAINTENANCE PERSON WENT INSIDE THE UNIT REMOVED ANY DRYWALL CUT THE OPENING APPROXIMATELY 2'X4' AND THEN PUT PLASTIC TO ALLOW ANY ADDITIONAL WATER TO DRIP FROM THE OPENING INTO A PLASTIC 15 GAL GARBAGE CONTAINER, THERE WERE NO HANGING OR DANGEROUS WIRES. THE KITCHEN HAD BEEN CLEANED. ASSISTANT MANAGER AND MAINTENANCE ALLOWED ENTRY AND PICTURES WERE TAKEN. IT SEEMS THAT MANAGEMENT HAS THE SITUATION UNDER CONTROL. MANAGER MENTIONED TENANT IS UPSET BECAUSE OF THE SITUATION, BUT THE SITUATION IS BEING HANDLED AND OF COURSE MORE RAIN IS EXPECTED. A CARD WITH CONTACT NUMBERS WAS GIVEN TO JANELLE, I ASKED IF FURTHER PROBLEMS ARE CREATED TO PLEASE CONTACT ME ASAP, AND WHEN THEY KNOW THE ROOFING MIGHT GET DONE.

CALLED RINCON ROOFING SPOKE WITH CINDY, WHO VERIFIED THEY DO ALOT OF COMMERCIAL WORK FOR ROMANO, BUT COULD NOT VERIFY IF THE UNIT WAS CALLED IN TODAY BUT ALSO MENTIONED DAN IS RESPONSIBLE FOR THAT WORK AND WAS NOT IN AT THIS TIME. SHE MENTIONED SHE WOULD HAVE DAN CONTACT ME.

PRIOR TO LEAVING THE COMPLEX AND BECAUSE IT WAS STARTING TO RAIN I DROVE BY THE OFFICE AND SPOKE TO JANELLE, ASKED IF IT DID START TO POUR THAT THEY MONITOR UNIT V TO BE SURE PLASTIC DID NOT COME DOWN AND UNTI FLOOD AGAIN. JANELLE SAID SHE WOULD

RECEIVED A CALL FROM JANELLE WHO MENTIONED BID WAS GIVEN BY RINCON FOR UNIT V , ACCEPTED BY ROMANO AND WORK WILL BEGIN ON 7/24/07 IF IT IS NOT RAINING.