Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM04612
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/12/2009 | ENGINEERING - FINAL | Approved | SEE T07BU00756 FOR AP 1. COMPLETE ALL SITE WORK IN CONFORMANCE WITH THE FINAL APPROVED GRADING PLAN. SEE T07BU00756 FOR AP 2. PROVIDE A LETTER OF CERTIFICATION AND REPORTS FROM THE ARIZONA REGISTERED P.E. THAT CERTIFYS THAT THE PROJECT IS CONSTRUCTED TO THE FINAL APPROVED GRADING PLAN. PER DEVELOPMENT STANDARD 11-01.16.0 ALL WORK CP- H/C PKNG SIGN HAS BEEN RAISED TO 7' 3. COMPLETE ALL PEDESTRIAN AND VEHICLE ACCESS CONSTRUCTION, PAVEMENT,CURBS, SIDEWALKS, A.D.A. ACCESSABILITY AND DRAINAGE IMPROVEMENTS. |
|
11/20/2008 | ENGINEERING - FINAL | Denied | NOT READY 1. COMPLETE ALL SITE WORK IN CONFORMANCE WITH THE FINAL APPROVED GRADING PLAN. 2. PROVIDE A LETTER OF CERTIFICATION AND REPORTS FROM THE ARIZONA REGISTERED P.E. THAT CERTIFYS THAT THE PROJECT IS CONSTRUCTED TO THE FINAL APPROVED GRADING PLAN. PER DEVELOPMENT STANDARD 11-01.16.0 3. COMPLETE ALL PEDESTRIAN AND VEHICLE ACCESS CONSTRUCTION, PAVEMENT,CURBS, SIDEWALKS, A.D.A. ACCESSABILITY AND DRAINAGE IMPROVEMENTS. |