Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2008 | FIRE SPKLR - FINAL | Approved | ||
| 04/30/2008 | FIRE SPKLR - FINAL | Partial Approval | REMOVE QR SPRINKLER HEAD FROM ROOM WITH STANDARD SPRINKLER HEADS. REPLACE PAINTED SPRINKLER HEAD EAST SOUTH BATHROOM HALLWAY. |
|
| 04/29/2008 | FIRE SPKLR - FINAL | Cancelled | IVRS - RI canceled | |
| 04/25/2008 | FIRE SPKLR - FINAL | Denied | Not approved 4.25/08. 1.) Replace painted sprinkler heads located in the chem. room. 2.) Secure sprinkler piping. 3.) Replace ceiling tiles where missing, throughout building. 4.) South storage room: a.) cover openings in ceiling. b.) replace damage sheet rock on ceiling. 5.) NW storage room, provide electrical power. 6.) Provide thumb-turn locks for courtyard gates. 7.) Electrical room: a.) lable door, "ELECTRICAL" or "ELECTRICAL ROOM". 8.) Change light fixture next to sprinkler head located next to east side south bathroom. 9.) Switch EXIT sign to the north kitchen exterior door. 10.) South kitchen door is hard to open. Sticks at bottom. 11.) Remove thumb-turn lock from N.entry. |