Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM04289
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/18/2008 | ENGINEERING - FINAL | Approved | OK for shell, chk for bike parking on final for TI | |
12/04/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMPORARY C OF O COMPLETE OUTSTANDING ITEMS WITHIN 30 DAYS PERMANENT C OF O NOT TO BE GIVEN UNTIL: 1. THE FINAL APPROVED GRADING PLAN IS PROVIDED. (n/a) 2. A LETTER OF CERTIFICATION FOR THE ENTIRE PROJECT IS PROVIDED. (PER DEVELOPMENT STANDARD 11-01.16.0) 3. ALL ITEMS LISTED ON THE FINAL GRADING INSPECTION ARE COMPLETED. SEE INSPECTION REPORT FOR T07BU01729 (11-13-08) LISTED BELOW: 1. PROVIDE AS-BUILT APPROVED FINAL GRADING PLAN. 2. PROVIDE (8) WALL OPENINGS AT N.E. CORNER OF SITE. COMPLETE 3. PROVIDE ROCK RIP RAP ON SLOPES EXCEEDING 3:1 ON N.E. CORNER OF SITE. 4. SHOW ON AS-BUILT PLANS, ALL ACTUAL PAVEMENT WIDTHS FOR PARKING SPACES AND PAAL'S. ADDRESS SURVEY STAKING AT BACK OF CURB (WITH ALLOWANCE FOR CURB BATTER). 5. COMPLETE ALL SITE PERIMETER LANDSCAPING AND WATER HARVESTING AREAS. 6. PROVIDE 2% MAXIMUM SLOPE AT ALL HANDICAP PARKING SPACES ON THE SOUTH PERIMETER. 7. PROVIDE 8' FENCE ON WEST PERIMETER. (OK PER ANDY VERA) 8. PROVIDE 10' X 10' CLEARANCE INSIDE TRASH ENCLOSURE BOLLARDS AT S.E. CORNER OF SITE. CONTACT ENVIRONMENTAL SERVICES, ANDY VERA 631-5160. 9. COMPLETE ALL COVERED PARKING CANOPY CONSTRUCTION. 10. SHOW RELOCATION OF BICYCLE PARKING ON AS-BUILT PLANS. 11. SHOW DRIVEWAY ENTRANCE FOR LOT #2 ON AS-BUILT PLAN. (COMPLETE) 12. PROVIDE D.G. TRAIL ON N.W. CORNER OF SITE. 13. REPAIR DRAINAGE SWALE ON NORTH PERIMETER. 14. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AND UN-NEEDED SWPPP CONTROLS. 15. STABILIZE UN-BUILT LOTS WITHIN 14 DAYS OF CESSATION OF CONSTRUCTION ACTIVITY. THIS IS NOT A CONDITION IF CONSTRUCTION CONTINUES. 16. POST BOND FOR UN-BUILT SIDEWALKS AT UN-BUILT LOTS. |
|
11/26/2008 | ENGINEERING - FINAL | Denied | PERMANENT C OF O NOT TO BE GIVEN UNTIL: 1. THE FINAL APPROVED GRADING PLAN IS PROVIDED. 2. A LETTER OF CERTIFICATION FOR THE ENTIRE PROJECT IS PROVIDED. (PER DEVELOPMENT STANDARD 11-01.16.0) 3. ALL ITEMS LISTED ON THE FINAL GRADING INSPECTION ARE COMPLETED. SEE INSPECTION REPORT FOR T07BU01729 (11-13-08) LISTED BELOW: 1. PROVIDE AS-BUILT APPROVED FINAL GRADING PLAN. 2. PROVIDE (8) WALL OPENINGS AT N.E. CORNER OF SITE. 3. PROVIDE ROCK RIP RAP ON SLOPES EXCEEDING 3:1 ON N.E. CORNER OF SITE. 4. SHOW ON AS-BUILT PLANS, ALL ACTUAL PAVEMENT WIDTHS FOR PARKING SPACES AND PAAL'S. ADDRESS SURVEY STAKING AT BACK OF CURB (WITH ALLOWANCE FOR CURB BATTER). 5. COMPLETE ALL SITE PERIMETER LANDSCAPING AND WATER HARVESTING AREAS. 6. PROVIDE 2% MAXIMUM SLOPE AT ALL HANDICAP PARKING SPACES ON THE SOUTH PERIMETER. 7. PROVIDE 8' FENCE ON WEST PERIMETER. 8. PROVIDE 10' X 10' CLEARANCE INSIDE TRASH ENCLOSURE BOLLARDS AT S.E. CORNER OF SITE. CONTACT ENVIRONMENTAL SERVICES, ANDY VERA 631-5160. 9. COMPLETE ALL COVERED PARKING CANOPY CONSTRUCTION. 10. SHOW RELOCATION OF BICYCLE PARKING ON AS-BUILT PLANS. 11. SHOW DRIVEWAY ENTRANCE FOR LOT #2 ON AS-BUILT PLAN. 12. PROVIDE D.G. TRAIL ON N.W. CORNER OF SITE. 13. REPAIR DRAINAGE SWALE ON NORTH PERIMETER. 14. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AND UN-NEEDED SWPPP CONTROLS. 15. STABILIZE UN-BUILT LOTS WITHIN 14 DAYS OF CESSATION OF CONSTRUCTION ACTIVITY. THIS IS NOT A CONDITION IF CONSTRUCTION CONTINUES. 16. POST BOND FOR UN-BUILT SIDEWALKS AT UN-BUILT LOTS. |
|
11/13/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMPORARY C OF O 1. COMPLETE NORTH COVERED PARKING CANOPYS AND PROVIDE A TOTAL OF 112 PARKING SPACES . 2. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION IS OCCURRING. 3. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 IS COMPLETED AND APPROVED. 4. PROVIDED THE AS-BUILT FINAL APPROVED GRADING PLAN. |