Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2008 | FRAMING | Approved | IVRS - Inspection :* | |
| 01/09/2008 | FRAMING | Not ready for Inspection | IVRS - Inspection :* NEED TO VERIFY FAN 1/8" PER FT 33' LENGTH 1) WEST UNIT: MISSING BANG PLATES, CONDENSATE, H20 SUPPLY 2) OVER NOTCHED STUD 3" VENT 3) LOOSE PLATE 4) END WALL H2.5 AT TOP CHORD ------------------------------------------------------------------------------------------------1) EAST UNIT: CLOSET FLANGE TO CLOSE TO TUB 15" MINIMUM 2) H2.5 AT END WALLS TO GO AT TOP CHORD |
|
| 01/07/2008 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL CONDUIT FOR ROOF PENETRATIONS 4 TOTAL-ROMEX 2 EACH SIDE EAST UNIT: 1) NEED ALL DWV PIPING H20 TESTED 2) PROTECT ALL PIPING AND WIRING FROM SHEETROCK NAILING THRU-OUT 3) VENT CU. SHOWING THRU SHEATH, ANCHOR BOLT NEEDED AT BOTTOM PLATE BELOW VENT 4) H20 LINES NOT COMPLETED, TUB/SHOWER VALVES NOT INSTALLED 5) OVER NOTCHED STUD IN NORTH BATH 6) CONCRETE IN ALL TUB BLOCK OUTS 7) CLOSET FLANGE MIN. 15" SOUTH BATH 8) TWO OVERSPAN STUDS HALL BATH AND AT HALLWAY 9) INSTALL H2.5 AT 48" ON CENTER END WALLS WEST UNIT: 1) SAME ITEMS FROM EAST UNIT BOTTOM SIMILAR 2) LOOSE PLATES THRU OUT 3) HCS: NEED JOINT SEWER AGREEMENT, PUT ALL 3 UNITS USING EJECTOR ON SITE PLAN, HAVE PIMA COUNTY OK SEWER PLAN, SEWER FROM HOUSE IS THAN EJECTOR INVERT. EJECTOR MUST BE VENTED, SEE ALL REQ. IN UPC |
|
| 12/20/2007 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE ALL TRADES AND STUCCO LATH 2) PROVIDE LEVEL/OR TRANSIT TO VERIFY POSITIVE FLOW AT SEWER FROM CLEANOUTS TO HCS CONNECTION |
|
| 12/05/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO PLANS FOUND 2) 1035 INSPECTION TO BE DONE AT INTERMEDIATES 3) COMPLY WITH PREVIOUS INSPECTION |
|
| 12/03/2007 | FRAMING | Not ready for Inspection | IVRS - Inspection :* |