Permit: T07CM04093

Parcel: 14027064A


Addresses:

2525 E VALENCIA RD

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
06/12/2009 ENGINEERING - FINAL Approved
06/04/2009 ENGINEERING - FINAL Partial Approval MET WITH LAURA LOHNER AND LOOKED OVER THE SITE TO DISCUSS THE PREVIOUS COMMENTS OF INSUFFICIENCIES. THE FOLLOWING AREAS STILL NEED TO BE ADDRESSED PRIOR TO THE DEVELOPER SCHEDULING A FINAL C OF O INSPECTION FOR THIS SITE: 1) COMPLETED THE REPAIRS TO THE ROOF DRAINAGE LOCATED ON THE WEST SIDE OF THE BUILDING THAT IS CURRENTLY DRAINING INTO HANDICAP ACCESSABLE AREAS. 2) MAKE THE NECESSARY MODIFICATIONS TO THE CERTIFICATION LETTER FOR THIS SITE.

ALL OTHER ISSUES PREVIOUSLY NOTED HAVE BEEN ADDRESSED AND ARE APPROVABLE AT THIS TIME.
05/27/2009 ENGINEERING - FINAL Partial Approval H.C. FRONTAGE FROM VALENCIA HAS BEEN ADDRESSED.

AWAITING LETTER FROM ENGINEER ADRESSING REMAINING PUNCH LIST ITEMS. CONTRACTOR WILL CALL IN FOR FINAL INSPECTION WHEN READY.
05/18/2009 ENGINEERING - FINAL Denied SPOKE WITH SOPHIA CYWINSKI 602-885-3423
NEEDS TO PROVIDE LETTER FROM ENGINEER ADRESSING THE REMAINING PUNCH LIST ITEMS:

1) REMOVE ALL DUMPSTERS AND STORAGE UNITS
2) FRONTAGE ACESS FROM VALENCIA RD NEEDS TO BE H.C. ACCESSIBLE
3) PROVIDE POS. FLOW SOUTHSIDE PARKING AREA
4) ADDRSS FLOW ALONG N/E CORNER OF PROJECT
5) ADDRESS FLOW FROM ROOF DRAINAGE EAST SIDE OF BLDG.
6) ADDRESS PONDING AROUND INCINERATOR
04/23/2009 ENGINEERING - FINAL Denied COMPLETE PUNCH LIST ITEMS
PROVIDE CERT. LETTERS FROM ENGINEER.
ENGINEER NEEDS TO ADDRESS ALL PONDING ISSUES REAR ROOF DRAINAGE OVER SIDEWALK.
04/14/2009 ENGINEERING - FINAL Denied JS says there are no approved site plan for this project. AZ State project.
04/13/2009 ENGINEERING - FINAL Denied Contractor needs to:
1- Complete all striping.
2- Complete all HC parking.
3- Backfill all open holes and trenches.
4- Stabilize all areas disturbed.
5- Install all water harvesting.
6- Remove all dumpsters, storage units and construction trailers.
7- Maintain 24' PAAL's.
8- Install all curb openings and scuppers.
9- Remove all construction debris.
10- Frontage access from Valencia Rd. Need to be HC accessible.
11- Remove all temp fencing.
12- Provide pos. flow southside parking.
13- Address flow along southeast corner of project.
14- Address flow from roof drainage eastside of building.
15- Address roof drain on HC ramp.
16- Address ponding around incinerator.