Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
11/05/2009 ENGINEERING - FINAL Approved
09/04/2008 ENGINEERING - FINAL Denied OK for temp C of O. Contractor needs to:
PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU00386 IS COMPLETED AND APPROVED.
08/29/2008 ENGINEERING - FINAL Denied SEE PREVIOUS NOTES
07/09/2008 ENGINEERING - FINAL Denied NOT READY, CONSULTATION WITH SEAN 250-2364 (NEW SUPERINTENDENT FOR RIO WEST) REGARDING THE REQUIREMENTS TO CLOSE OUT THE GRADING PLAN AND FINAL THIS BUILDING.
1. C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU00386 IS COMPLETED AND APPROVED.
2. PROVIDE A REVISED AND C.O.T APPROVED GRADING PLAN THAT SHOWS AS-BUILT CONDITIONS INCLUDING REVISIONS TO DRAINAGE PATTERNS.
06/05/2008 ENGINEERING - FINAL Denied SEE PREVIOUS NOTES
REFEE FOR INSPECTION APPLIES
05/12/2008 ENGINEERING - FINAL Denied 1. C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU00386 IS COMPLETED AND APPROVED.
2. PROVIDE A REVISED AND C.O.T APPROVED GRADING PLAN THAT SHOWS AS-BUILT CONDITIONS INCLUDING REVISIONS TO DRAINAGE PATTERNS.
3.CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
4. RAISE UTILITY BOX FLUS WITH SIDEWALK NEAR SW CORNER OF BUILDING.
5. CLEAN UP AND MAINTAIN PEDESTRIAN WALKWAYS AND WATER HARVEST BASIN AREAS.