Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2009 | ENGINEERING - FINAL | Approved | ||
| 09/04/2008 | ENGINEERING - FINAL | Denied | OK for temp C of O. Contractor needs to: PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU00386 IS COMPLETED AND APPROVED. |
|
| 08/29/2008 | ENGINEERING - FINAL | Denied | SEE PREVIOUS NOTES | |
| 07/09/2008 | ENGINEERING - FINAL | Denied | NOT READY, CONSULTATION WITH SEAN 250-2364 (NEW SUPERINTENDENT FOR RIO WEST) REGARDING THE REQUIREMENTS TO CLOSE OUT THE GRADING PLAN AND FINAL THIS BUILDING. 1. C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU00386 IS COMPLETED AND APPROVED. 2. PROVIDE A REVISED AND C.O.T APPROVED GRADING PLAN THAT SHOWS AS-BUILT CONDITIONS INCLUDING REVISIONS TO DRAINAGE PATTERNS. |
|
| 06/05/2008 | ENGINEERING - FINAL | Denied | SEE PREVIOUS NOTES REFEE FOR INSPECTION APPLIES |
|
| 05/12/2008 | ENGINEERING - FINAL | Denied | 1. C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU00386 IS COMPLETED AND APPROVED. 2. PROVIDE A REVISED AND C.O.T APPROVED GRADING PLAN THAT SHOWS AS-BUILT CONDITIONS INCLUDING REVISIONS TO DRAINAGE PATTERNS. 3.CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 4. RAISE UTILITY BOX FLUS WITH SIDEWALK NEAR SW CORNER OF BUILDING. 5. CLEAN UP AND MAINTAIN PEDESTRIAN WALKWAYS AND WATER HARVEST BASIN AREAS. |