Permit: T07CM03770

Parcel: 11713069E

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
09/28/2009 PLUMBING - FINAL Approved IVRS - Inspection :*
09/25/2009 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
09/23/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) PROVIDE LOWER LEVEL PARKING CLEANOUT FOR FLOOR DRAINS
2) PROVIDE 2 HOLE CLAMP FOR DISHWASHER DISCONNECTING HOSE
3) PROVIDE TEST ON ALL SHOWER PAN DRAINS
4) LIST NOT COMPLETE
09/18/2009 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
1) PROVIDE CERT FOR BACK FANS, PROVIDE FLOOR SINK ? IN BACK ROOM. COMPLETE OIL AND ? ?
2) PROVIDE CLEANOUT FOR SITE SEWER IN PARKING LOT
3) COMPLETE ? AREA
09/17/2009 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
1. COMPLETE CLEANOUT IN BATHROOM 237
2. EXTEND VENT ON ROOF ABOVE MAKEUP AIR
3. ????????????/
09/16/2009 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
09/16/2009 PLUMBING - FINAL Partial Approval 1. 262, 251A & B, 242 OK
2. 266 COMPLETE INSTALLATION OF FAUCET
3. RUN PIPING FROM PRESS RELIEF VALVE OF SOLAR PIING IN WATER HEATER ROOMS

LIST FROM 9/4 IS COMPLETE
09/11/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) ROOM 289-PROVIDE ACCESS FOR CLEANOUTS
2) MENS REST ROOM #290-OK
09/09/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
09/04/2009 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
1) ADD BACKFLOW PROTECT AND REPAIR LEAK IN ROOM #154A
2) MOVE WATER PIPING UNDER LAV FOR CLEANOUT IN ROOM #157
3) COMPLETE INSTALL OF WATER COOLERS IN ROOM #134
4) COMPLETE INSTALL OF FAUCET AND PROVIDE HOT WATER ROOM #129
5) PROVIDE SUPPORT ON HOT WATER PIPING UNDER LAV IN 119A
6) LIST NOT COMPLETE
09/01/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
08/31/2009 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
1) NO CHECK ON SITE FOR $150.00 FROM SUNDT FOR AFTER HOURS. SUNDT TO PAY FOR AFTER HOURS AT 201 N. STONE MINIMUM OF 2 HOUR INSPECTION PER JASON
2) CLEAN WATER REPORT ON SITE
3) RESTROOM ON 1ST FLOOR AND 2ND FLOOR NOT DONE, BUT OK TO USE
4) LIST IS NOT COMPLETE
08/28/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
08/07/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) PROVIDE CLEANOUT FOR SITE SEWER
2) COMPLETE ALL PLUMBING FIXTURES
3) PROVIDE CHLORINATION REPORT AND CLEAN BACTERIA REPORT
4) LIST IS NOT COMPLETE