Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 02/26/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 2" FORCE MAIN ON EAST SIDE OF BUILDING TEST OK AND TRACER WIRE OK |
|
| 12/12/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* SOUTH SIDE OF BUILDING SUMP PUMP FOR AREA DRAIN TEST TRACER WIRE OK |
|
| 12/11/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. 2" PVC FROM SUMP PUMP FROM AREA DRAIN TEST OK 2. C1.2 HAS HIGHLIGHT FOR SITE SEWER BEDDING TRACER WIRE - SDR35 OK TO BE TESTED AT LATER DATE |
|
| 12/10/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 11/21/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST ON INTERCEPTOR OK |
|
| 11/19/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* HIGHLIGHT ON PAGE P1.2 |
|
| 11/17/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 10/30/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PER HIGHLIGHT ON P1.2 |
|
| 10/23/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* AREA DRAIN PIPING COMPLETE |
|
| 10/21/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* COMPLETE AREA DRAWING BEFORE CALLING IN FOR INSPECTION |
|
| 10/17/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PER HIGHLIGHT ON PAGE P1.2 |
|
| 10/15/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* AREA DRAIN ON SOUTHEAST END OF BUILDING |
|
| 10/13/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PARTIAL PRE-HIGHLIGHT ON PAGE P.1.2 |
|
| 09/29/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PERIMETER DRAIN ALONG SOUTHWEST CORNER OK TO COVER PERIMETER DRAIN ALONG "K" LINE OK TO COVER |
|
| 09/24/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/19/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* P.11A & P.1.1 PER HIGHLIGHT TEST OK |
|
| 09/10/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/21/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* HIGHLIGHT ON P.1.1 AND P1.1 FOR DRAIN PIPING TEST OK |
|
| 08/14/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* ROUGH SOIL PER HIGHLIGHT ON P1.0 |
|
| 08/07/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) HIGHLIGHT TEST OK ON FLOOR DRAWING ON PAGE P1.0 |
|
| 08/06/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) IS PIPING PER PLAN ? PROVIDE NEW TEST 2) PIPING TO FLOOR SINK REMOVE MUD ? DRY FILL |
|
| 08/04/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* AREA DRAIN PER HIGHLIGHT ON PAGE P1.0 |
|
| 07/16/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. PER HIGHLIGHT ON PAGE P1.0 FLOOR SINK PIPING TEST JUST PAST STORAGE/P206/NORTHWALL 2. AREA DRAIN ON WEST SIDE OF BUILDING PER HIGHLIGHT P1.0 |
|
| 07/08/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. 4" PVC BLDG. PERIMETER DRAIN, EXTENDED FROM 05/28/08 TO NORTHERNMOST POINT OF THE BUILDING - OK TO COVER 2. I DID NOT SEE ANY PERIMETER DRAINAGE PIPING INSTALLED ON THE WEST SIDE OF THE BLDG. |
|
| 06/25/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. CONTRACTOR WILL WRAP ALL PIPING AT P-208 LOWER LEVEL PARKING 2. OK TO POUR THIS AREA ONLY |
|
| 06/24/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. SUNDT HAS NOT SECURED A PERMIT FOR WATER TO THE TRAILER. A PRESSURE VACUUM BREAKER IS NOT THE CORRECT BACKFLOW DEVICE AND ALL HOSE BIBS ARE TO HAVE AVB's IMMEDIATELY 2. YOU ARE STILL COVERING WITHOUT PERMISSION 3. ALL FIXTURE TRAPS, INTERCEPTORS, ETC. REQUIRE VENTS |
|
| 06/23/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. PLEASE POST YOUR ADDRESS - SEE ACCOMPANYING DISPLAY REQUIREMENTS 2. THE LETTER ACCEPTING 1% MUST BE ON ENGINEER'S LETTERHEAD WITH STAMP 3. I DID NOT GIVE PERMISSION TO COVER ROUGH/SOIL AT THIS AREA 4. PIPING IS NOT COMPLETE IN THIS AREA 5. I CAN DO PARTIALS BUT TRY AND GIVE ME A COMPLETE SECTION AT A TIME 6. NEED TO SEE VENT AT LIFT STATION |
|
| 06/20/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. YOU HAVE AN ADDRESSING PROBLEM 300 S FIRE CENTRAL PL DOES NOT EXIST 495 W CUSHING NEEDS TO BE POSTED AND REFLECTED ON YOUR PERMIT 2. CORRECT BACKPITCHED SECTIONS. ALL PIPING TO HAVE 2% GRADE UNLESS NOTED OTHERWISE 3. N/H BANDS ARE LISTED FOR CAST IRON. USE MISSION BAND AT N/H X PL 4. PROVIDE ENGINEERING FOR ACCEPTANCE AT 1% |
|
| 05/28/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 4" PVC SOUTH END OF BUILDING 10' GOING WEST AND FROM SOUTH END TO NORTH END 120' (4" DRAIN TILE TO SUMP PIT) PAGE A3.2 |