Permit: T07CM03770

Parcel: 11713069E

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
10/14/2009 ELECTRIC - FINAL Approved IVRS - Inspection :*
1) ITEMS ON LIST OK
10/09/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) ALL LIGHTS ARE INSTALLED OUTDOORS-WE CAN NOW DO OUTDOOR LIGHTING CALCUS PER OUTDOOR LIGHTING CODES AS DISCUSSED
2) OK GATE AND GARAGE CONTROLS
3) FINISH PREVIOUS
09/28/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) FINISH MAKE UO PULL BOX MEMORIAL
2) ONLY 2 CONDUCTORS TO A SLIP BOND-PARKING CONTROL
3) FINISH PREVIOUS ITEM MARKED
09/18/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) OK SHADE MOTORS AND CONTROLS
2) OK CLIMATIC WIRING, EXCEPT P201
3) FINISH GATE AND GARAGE CONTROL WIRING
4) FINISH WORK AT PARK
5) NO CORDS ABOVE CEILINGS
09/17/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
09/16/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) NEED R CLIPS
2) FINISH STRAPPING
3) LABEL PER 210.5
4) CONTRACTORS TO BE LISTED
5) CONFERENCE 2ND FLOOR VERIFY MOTOR LISTING
6) CORDS NOT ALLOWED ABOVE CEILING 400.7 + 8
7) TIGHTEN FITTINGS
09/14/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
09/11/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
09/10/2009 ELECTRIC - FINAL Partial Approval FINISH: CLIMATEC WIRING, DOOR MOTORS GARAGE, LOWER LEVEL LIGHTING, BATHROOM COVE LIGHTS, LISTING SHADE MOTORS & CONNECTIONS, CONDUIT ROOM 201, LAST CHECK OF MAIN ELECTRIC ROOM, DRYWALL FIXTURES.
09/09/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
09/08/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
09/03/2009 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
09/02/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
09/01/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/31/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/28/2009 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
08/26/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
KITCHEN/DINING:
1) FINISH VDV CABLING AND OPEN TILES TO INSPECT
OUTSIDE:
1) FINISH COVERS FOR DEVICES
2) GROUND POLES AS DISCUSSED
3) MISSING BOLLARDS WEST GATE
4) SPLICE TO BE FOR WET LOCATION
5) OK ROOMS FOR FINAL 200C,200D,200A,300A,400A & B, 200E AND 200B
6) 210 EXCEPT LIGHTING
7) OK GROUNDING AT GENERATOR-8 OHMS
8) EM KILL LIGHTS NEED 103 AND 100E
08/25/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) EM LIGHTING NOT WORKING: FITNESS, APPARATUS BAY, WEST
2) EM LIGHTING NOT WORKING: 2ND FLOOR BREAKROOM, 3RD FLOOR STAIRWELL, BELL TOWER AND CONFERENCE
3) OK P100 AND P200 ABOVE CEILING
4) OK EQUIPMENT LABELING LOWER LEVELS 1 & 2
08/24/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/21/2009 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
1) OK PVC AT BARRIO MEMORIAL
08/20/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) NORTH ELEVATORS: OPEN BOXES, SUPPORT WIRES, VDV ?ING
2) FINISH BATHROOM COVE LIGHTS - BACK ORDERED
3) FINISH WATER HEATER ROOMS

OK DORMROOM BATHROOMS EXCEPT LIGHTS
OK OUTSIDE PORCHES 2ND FL PATIO'S
OK PVC FOR WEST GATES
OK PVC SERVERS ACCESS SIDEWALKS REAR GABAGE AREA
OK ROOMS FOR FINAL 242,242A,243,203,205,207,208
08/19/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) OK ABOVE CEILING 102,103,P100D AND P200D
2) OK ROOMS FOR FINAL P102,P103,P105 AND P100J
3) RECEIVED GENERATOR REPORT
4) BOND BUSHING LIEBERT UNIT-1ST LL-ACU-01A
5) BOND METAL RACEWAY LIEBERT-250.64(E)
6) VERIFY LIGHTING COMM ROOM B101A
7) FILL UNUSED OPENINGS IN FIXTURES
08/18/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) OK ABOVE PANELS, OK LABELING ROOFS AND OK PVC AS MARKED
2) FINISH AS DISCUSSED FOR TOMORROW
08/17/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/14/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/13/2009 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
08/12/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/11/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) NEED MORE INFORMATION FOR SCREEN IN TRAINING ROOM-NOT ON PLANS
2) JUNCTION BOXES TO BE ACCESSIBLE
3) USE APPROVED CONNECTORS WITH SEAL TITE AND TIGHTEN FITTINGS
4) OK ROOMS FOR FINAL 139-152, 121A & 127-132
08/10/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/07/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/06/2009 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*