Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07CM03770

Parcel: 11713069E

Inspection Status: Approved

Inspection History: ELECTRIC - INTERMEDIATE

Date Description Inspector Results Comments
09/28/2009 ELECTRIC - INTERMEDIATE Approved IVRS - Inspection :*
08/19/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
08/18/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
08/17/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) FILL UNUSED CONDUIT OPENINGS ABOVE PANELS
2) VERIFY B-1 AND E FIXTURES FOR SURFACE MOUNT-GYP BOARD FLANGED
3) BOXES MORE THAN 1/4" FROM BOX TO SURFACE
4) FINISH BATHROOMS
5) OK LID ROOM 204A
6) OK ABOVE CEILING 200E, 205 & 206
7) OK DORM ROOMS FOR FINAL
8) OK KITCHEN ISLAND WIRING
08/13/2009 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
08/11/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
08/10/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
08/06/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
08/05/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK 1 MC CONDUIT REPAIRS BACK OF APPARATUS BAY
2) OK PVC CONDUIT REPAIR STREET LIGHTING ON GRANADA
08/04/2009 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
08/03/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK POLE BASES AS MARKED
2) OK EXTERIOR LOBBY HOOD
3) OK JUNCTION BOXES ABOVE CEILING 2
07/31/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK REDO FOR PVC REMOTE ANNUNCIATOR PANEL
2) OK PVC PER GATE ISLAND
3) OK ABOVE CEILING 286 A AND 266 EXCEPT AT PULL BOXES
4) OK WALLS 100 D
5) POLE BASES NOT READY-DO NOT POUR
07/30/2009 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
07/29/2009 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
07/28/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK POWER FOR PROJECTOR 121
2) OK PVC POLE TO POLE AS MARKED
07/27/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/24/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/23/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
2ND FLOOR:
1) SUPPORT FIXTURE 1 PER 4' OF FIXTURE-KITCHEN
2) FINISH VDV-RM 286
3) FINISH POWER FOR PROJECTOR-ROOM 121
4) OK ELECTRIC ABOVE CEILING ROOM 121 AND 286 AS NOTED
5) OK ELECTRIC ABOVE CEILING ROOM 252-255
07/22/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/21/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK PVC IN WALLS FOR LOW VOLTAGE AT MOUNUMENTS IN FRONT
1ST FLOOR:
1) WHAT IS WITH PROJECTOR AND SCREEN
2ND FLOOR:
1) FINISH VDV CABELING
2) FINISH MAKE UP
07/20/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) FINISH VDV CABELING
2) NEED MECHANICAL CLAMP FOR LIGHTING CONDUCTORS
3) FINISH POWER POLES
4) ATTACH FIXTURES TO GRID
5) BOX OVER FILLED
6) OK ABOVE CEILING 243-250, 257-263
7) OK WALLS AND LID P100A
07/17/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/16/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK PVC CONDUIT AT MONUMENT AS MARKED
2) LIGHTS LOWER LEVELS: PROVIDE DISCONNECTING MEANS AT FIXTURE 410.63 (G) AND FILL UNUSED OPENINGS IN FIXTURES
07/15/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/14/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/13/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/10/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK WALLS 204 (B)
2) OK PVC CONDUIT AS MARKED
3) MAINTAIN CLEARANCES AT VAV IN KITCHEN 206
07/09/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/08/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK ABOVE CELL 269-277,282-284
2) OK HARD LID AND WALLS STAIRWELL 100A 1ST FLOOR
07/07/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) FINISH ROOMS
2) FINISH ABOVE CEILINGS
3) OK THE LV PVC RUN INTO LOWER LEVEL 1
07/06/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK ELECTRIC LIGHTS AND CONDUIT ROOM 121-FINISH VDV CABELING
2) OK HARD LIDS AND WALLS STAIRWELL 200A-2ND FLOOR
3) OK HARD LID ROOM 116
4) OK CANS SOFFIT 242
5) OK PVC CONDUIT FOR LV LIGHTING
6) OK RIGID ACROSS FOOTING
07/02/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK ABOVE CEILING ROOM
2) OK HARD LID ROOM #223,227,235,239 & 200G
3) OK 6 WALKWAY LIGHTS AND CONDUIT AS MARKED SUBJECT AFTER HOLIDAY
MEMORIAL:
1) GROUND ROD FOR LIGHTING DAMAGED AND BENT CANNOT USE
07/01/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
06/30/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
06/29/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 750 KUA XFMR: POND PER 250.122-BOLT TO PAD
2) NEED INSTRCUTIONS FOR SECURING UPS TO PAD
3) NEED ILLUMINATION AT PANELS 110.26
4) LABEL COVERS OF PANELS AND SWITCH BOARD PER 210.5 FOR SYSTEMS
5) DERATE IN GUTTTER ? 366
6) A BOND WILL BE NEEDED FOR TEMP POWER FOR TEST
7) OK ELECTRIC ABOVE CEILING ROOMS 123-125 AND 127
8) OK EQUIPMENT WITH GREEN LABELS
9) OK TO MAIN LUGS ONLY 1ST AND 2ND FLOOR 126 AND 256A
06/26/2009 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
06/25/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK REDO PVC & RIGID ENTRY BOLLARDS
OK 234, 233A, 221
06/24/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK CAN SOFFIT RM.208
OK PVC CONDUIT AS MARKED
06/23/2009 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
06/23/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK CORRIDOR 268.201 HARD LIDS
OK FLEX CONDUITS RM. 118

OK ELECTRIC ABOVE CEILING 129-133 AFTER CORRECTIONS
OK HARD LID RM. 266, 242A
06/22/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
SUPPORT VDV CABLING 725.24 AND 300.11
06/19/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK LIDS STAIRWELL 200C ALL LEVELS
2) OK WALLS STAIRWELL 200A
3) OK WALLS AND LIDS 235,237,229 & 226
4) OK WALLS AND NORTH SOFFIT 208
06/18/2009 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) OK 4-4" PVC CONTINUATION EAST TO WEST TO VAULT 70'
06/17/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK HARD LIDS 212, 214, 216, 218, 220, 224, 213, 215, 217, 228, 230, 232, 236, 238, 240, CORRIDOR 264 IN FRONT OF ELEC. RM.
OK ABOVE CEILING 139-151 AFTER CORRECTIONS

1. SUPPORT VDV CABLING 725.24, 300.11 -- SPEAKERS
2. ATTACH TO CABLE TRAY UPON EXITING
3. SECURELY ATTACH FIXTURES TO GRID 410.16
4. FINISH INSTALLING CORD FOR LIGHTS PER MFG. INSTRUCTIONS
06/16/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK 3 LIGHTS IN CONCRETE IN FRONT OF GAZEBO
OK WALLS 200H, 22, 219

1. CORDS NOT ALLOWED ABOVE CEILING - INSTALL AS PER MANUFACTURES INSTRUCTIONS
2. SUPPORT VDV CABLING 725.24, 800.24, 300.11
06/15/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
06/11/2009 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. REMOVE ROCK & INSULATION ROOMS 228, 230, 232
TO INSPECT

*DO NOT ONE SIDE WITHOUT INSPECTORS APPROVAL

2. REMOVE TEMP WIRING BEFORE ROCKING LID

OK WALLS ONLY 213, 215, 217, 226, 236, 238, 240, 203
OK LID CORRIDOR 264
06/09/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
2ND FLOOR CORRIDOR LID ELECTRIC ROOM NORTH
06/08/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK HARD LID 109
OK ROOMS 212, 214, 216, 218, 220, 222, 224 - WALLS AND LIDS
06/02/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/29/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK POLE BASES AS MARKED
OK WALLS ROOM 101, 102

1. JUNCTION BOXES TO BE ACCESSIBLE
05/27/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/21/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/15/2009 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
ANSWERED CODE QUESTIONS
OK PVC FOR SITE LIGHTS AS MARKED
05/14/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/12/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK ROOMS 286, 286A, 289, 290
05/07/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK 7 PVC CONDUITS TO LIGHTS AND GAZEBO
OK ROOM 112, 118 AND 119 HARD LIDS

JUNCTION BOXES TO BE ACCESSIBLE
05/06/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/01/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK HALL 278, ROOM 254-255A, 200D, 285, 286A, 243
OPEN TO BELOW COLUMNS

OK CORRIDOR CEILINGS 122 TO COLUMN LINE "G" 135, 152, 137

1. UNCOVER STAIRWELLS FOR INSPECTIONS

*FINISH ROOMS TO GET ROOM INSPECTIONS
ALSO, DO NOT COVER WITHOUT INSPECTIONS.

*ELECTRIC ROOM TO MEET REQUIREMENTS OF 110.26
04/01/2009 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*