Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2009 | ELECTRIC - UNDERGROUND | Approved | IVRS - Inspection :* | |
| 09/14/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) BOND BUSHINGS FOR HUB AT SERVICE 250.92 & 250.97 2) OK LFNMC AT ORCHARD |
|
| 09/08/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK OUTDOOR LIGHTS AS DISCUSSED WITH RANDY 2) OK PANEL SCHEDULES ELECTRIC ROOM 256 & 126 3) OK A/C IN COMM ROOMS 256A AND 126A 4) OK LIGHTS IN CONFERENCE ROOMS |
|
| 09/03/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 09/02/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK PVC AND BOLLARDS AS MARKED 2) OK IRRIGATION PVC CONDUITS WEST SIDE |
|
| 09/01/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 08/21/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 08/18/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 08/10/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 08/07/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK 3 PVC CONDUIT FOR WEST GATE 2) OK ROOMS 269-275, 277, 282-284 FOR FINAL 3) FINISH FLOOR BOXES 4) FINISH POWER CHECKING |
|
| 08/05/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 08/03/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/31/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/29/2009 | ELECTRIC - UNDERGROUND | Not ready for Inspection | IVRS - Inspection :* | |
| 07/28/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/27/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK ABOVE CEILING ROOM 255A 2) OK 6-3/4" 90 DEGREE STUBS FROM OWNERS PANEL 3) OK POLE TO POLE AS MARKED 4) SUPPORT FLEX RACEWASY FOR OFFICE FURNITURE |
|
| 07/24/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK PARTIAL AIR HANDLERS, 1 & 2 TO TEST 2) OK LAST 20' PVC FROM PULL BOX TO HOUSE PANEL 3) OK SERVICE LATERAL HOUSE PANEL TO TEP 4) NO CONDUIT OUT WEST TO MONUMENT |
|
| 07/22/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK PVC FOR GATES AS MARKED 2) INSTALL VDV CABELING PER CODES 3) SEAL UNUSED CONDUIT OPENINGS 4) 3/0 PEN CLOSED CEILING COVERED WITHOUT INSPECTION |
|
| 07/21/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/17/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK ELECTRIC ABOVE CEILING #286 2) OK PVC CONDUIT PER LIGHTING AS MARKED |
|
| 07/16/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/15/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/14/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK PVC LIGHTING AS MARKED 2) OK LOWER LEVEL 2 STAIRWELL P200 3) OK LOWER LEVEL 1 STAIRWELL P100 ENTRACE 4) OK STAIRWELL 100E |
|
| 07/13/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK PVC CONDUITS FOR LIGHTING AS MARKED 2) OK 2ND FLOOR ELECTRIC ROOM TO FRAME CEILING SO ELECTRICIAN CAN FINISH PIPING |
|
| 07/10/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/07/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/06/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/02/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/01/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK WALLS 239,237 & 200G 2) OK HARD LIDS 237,235,227 & 200C 3) OK ELECTRIC ABOVE CEILING ROOM 134 4) OK ENTRY PVC CONDUIT IN FRONT 5) CONTRACTOR TO MAINTAIN LOCKOUT/TAG OUT WHILE POWER IS ENERGIZED 6) RECEIVED LETTER FOR TORQUE, EQUIPMENT TESTING AND GFI TEST |
|
| 06/30/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* SERVICE: 1) PLEASE VERIFY A/C RATING OF PANELS 2) OK BELL TOWER WALL AND LID STAIRWELL 'A' 3) OK 3RD FLOOR WALLS AND LID STAIRWELL 'A' 4) OK 2ND FLOOR LID STAIRWELL 'A' 5) OK TO MAIN LUGS AT PANELS IN MAIN ELECTRIC ROOM 6) OK 4 WALK WAY LIGHTS AND CONDUIT AS MARKED 7) OK EQUIPMENT AS MARKED WITH GREEN LABELS |
|
| 06/26/2009 | ELECTRIC - UNDERGROUND | Not ready for Inspection | IVRS - Inspection :* 1) SERVICE: WEST WALL 2ND LOWER LEVEL 2) BONDING TO BE PER 250.102 AND 250.66 3) PLEASE VERIFY STRUCTUAL STEEL BOND 250.104 (C) 4) NEED MANUFACTURERS INSTRUCTIONS FOR GEAR |
|
| 06/25/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 06/24/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 06/18/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 06/16/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 06/15/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* DO NOT ONE SIDE WITHOUT APPROVAL OF INSPECTORS OK 3 - 4" PVC 120' PAST RIGID 90 DEG.'s EAST TO WEST AT STREET OK WALLS ROOMS 207, 208 COMMON WALL TO DORMS 223, 225, 238, 240, 200F, COVERED PATIO, 205 EXTERIOR, HALL 202, BELL TOWER |
|
| 06/04/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK INSTALL OF RIGID AREAS CULVERT AS REQUESTED BY RICK HOLLANDER |
|
| 06/02/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK HARD LID RM. 106 OK POLE TO POLE AS MARKED |
|
| 05/29/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 05/27/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK WALLS ROOM 242 OK POLE BASES AS NEEDED |
|
| 05/21/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) PLEASE VERIFY FILL CAPACITY OF CUTDOWN FLOOR BOXES ROOM 266 2) OK WALLS ROOM 266,252.253 AND 251 A & B 3) OK 3 POLE BASES AS MARKED ON PLANS |
|
| 05/15/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 05/14/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK CORRIDOR CANS 2) OK PVC CONDUITS FOR SITE LIGHTING IS MARKED 3) OK RELOCATION OF DATA PULL BOX AND CONDUITS 4) OK STAIR WELLS-3 |
|
| 05/07/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 05/06/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK PVC CONDUIT IN CONCRETE WALL FOR 8 LIGHTS |
|
| 03/13/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK 1ST FLOOR WALLS |
|
| 03/02/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK 4" U.G CONDUIT FOR QWEST COMM. |
|
| 02/06/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK UNDER SLAB CONDUITS APPARATUS ROOM AND GAZEBO ROUGH UNDERGROUND |
|
| 01/29/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1. OK CONDUITS 2ND FLOOR DECK (FLOOR) 2. NOTE THAT SPRINKLER HEADS TOO CLOSE TO FIXTURE J-BOXES IN CONCRETE. THIS WILL COMPROMISE SAFETY WHEN ACCESSING SPLICES OR MAKE UP 90.4, 110.1, 110.12 LOWER LEVEL PARKING CONTACT PERSON: BRETT @ 400-1426 |
|
| 12/16/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK 4" PVC DUCT FOR DATA EAST SIDE OF BLD. |
|
| 11/17/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK SECONDARYS FROM SES TO TEP X-FORMER |
|
| 11/07/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* UNDER SLAB BRANCH CIRCUIT RM. 114 OK CONTINUE 4' DATA N. OF PROJECT ALSO 2' CONDUIT FOR LIGHTING |
|
| 10/15/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK 8 TO 9 LINE IN SLAB OK L1 PARKING DECK, NORTH |
|
| 09/30/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK DATA & COMM. DUCT BANK FROM BLD. TO NORTH OF BLD. AND CUSHING STREET |
|
| 09/22/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK SOUTH 1/2 1ST FLOOR DECK |
|
| 09/09/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* NORTH 1/2 LEVEL 1 NORTH (ADMIN) FLOOR BOXES & CONDUIT |
|
| 08/05/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK LOWER LEVEL #1 DECK ROUGH IN |
|
| 07/29/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1. OK LEVEL #1 NORTH 1/2 IN SLAB ROUGH 2. OK ELECTRIC ROOM LEVEL #2 |
|
| 07/03/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1. OK BRANCH CIRCUIT CONDUITS & ELEVATOR 2ND LEVEL BASEMENT BETWEEN 8 & 9 LINE BELOW SLAB |
|
| 06/17/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1. OK SECONDARY STUBBED OUT OF ELEC. ROOM 2. OK PARTIAL BRANCH CIRCUITS IN FLOOR TO WALLS AT EAST WALL 2ND LEVEL |
|
| 06/06/2008 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK U.G BRANCH FOR SECOND LOWER LEVEL PARKING, NORTH SECTION |