Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2009 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* | |
| 08/17/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) 1ST LIFT REMAINING SITE WALL NORTH WEST CORNER |
|
| 08/05/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) 1ST LIFT WEST SIDE FROM GATE TO 2ND EXPANSION |
|
| 08/04/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) TOP OUT RADIUS WALL FROM BLDG TO CONTROL JOINT POST RADIUS |
|
| 07/31/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) 1ST LIFT FOR 8' SCREEN WALL WEST SIDE CENTER VERTS IN CELLS |
|
| 06/04/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* INFILL ABOVE NORTH ELEVATOR TO BE SPECIAL INSPECTED SK-36 THRU 41 |
|
| 04/01/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* RFI 385 FIX FOR NORTH WINDOW OPENINGS |
|
| 03/31/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SITE WALL AT NE CORNER TO 4' |
|
| 03/27/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. EAST SIGHT WALL NORTH END TO 4' 2. APPARATUS BAY SW CORNER AT STAIRS TOP OUT TO BE SPECIAL INSPECTED |
|
| 03/26/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 18-E TO C.4 4' ABOVE 2ND FLOOR E 17 TO 18 4' ABOVE FLOOR 2. SOUTH CORNER OF WE SITE WALL TOP OUT 3. INSTALLING VERTS TO BE SPECIAL INSPECTED |
|
| 03/20/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* WORKING ON EAST SITE WALL |
|
| 03/19/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* LT7 LINTELS AT LINE 6 AND 0.5 |
|
| 03/18/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 03/17/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. MISSING WELD PLATES 9-A.8 TO B4 TOPOUT 2. 9.5-C.5 TO F 3. 2ND LIFT EAST SITE WALL |
|
| 03/16/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT 2ND FLOOR WEST WALL APP ROOM |
|
| 03/13/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 80' OF EAST SITE WALL TOP OUT |
|
| 03/12/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* EAST SITE WALL 1 #4 GRADE LEVEL BOND BEAM TO 4'8" |
|
| 03/11/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* A.2 - B.8 30' TO 34' 18 - B TO C TO 8' WITH LT1 17 LT1 LINTEL |
|
| 03/10/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 60' OF E.SIDE WALL TO 4'8" 2. 8 - A TO B5 12' ABOVE 2ND FLOOR 9 - A TO B5 3. 16.5 - E TO C ABOVE 2ND FLOOR |
|
| 03/05/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 18-C.8 TO B 4' AFF 2. A.2 - 8 TO 9 8' AFF AND RETURN WALLS |
|
| 03/04/2009 | REINFORCED MASONRY PRE-GROUT | Cancelled | IVRS - RI canceled | |
| 03/03/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* HOSE APPARATUS ROOM 5 WALL 6 COURSES FROM TOP OUT |
|
| 03/02/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* WORKING FIRE POLE ROOM |
|
| 02/28/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* K-8 TO 9 TOP OUT |
|
| 02/26/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* | |
| 02/26/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1. WORKING ON 5.4 L TO K LT-7 NO BLOCK LAYED YET 2. C.2 - 6 TO 6.8 TO 14" FROM DECK |
|
| 02/25/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 2 EAST COLUMNS ON 2ND FLOOR EXT. BALCONY TO 8' 2. PHIL ON SITE |
|
| 02/24/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. SOUTH STAIRWELL W&S WALL TOP OUT 2. MC1 COLUMNS 5.5 - L TO K 4' TO 8' 3. A.2-8 TO 9 TO 4' 4. PHIL ON SITE |
|
| 02/20/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. LT7 LINTELS C.3-6 TO 6.8 2. 2 COLUMNS TO 20' 5.4 L TO K 3. 2ND FLOOR WING WALLS TO 8' LINES 11 & 15 4. 2ND FLOOR 17-E TO C TO 4' |
|
| 02/19/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 02/18/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* F-9.5 TO 15 LT1 LINTEL AND TOP BOND BEAM |
|
| 02/17/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3 INTERIOR COLUMNS C.25 6 TO 6.8 |
|
| 02/13/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* NOTHING READY FOR GROUT; BRICK TOPPING & INFILL & COL. PROGRESS OK |
|
| 02/12/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) LINTELS ON EAST; TOP AT WEST; COL AND 4' INFILL |
|
| 02/11/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* PROGRESS ONLY NOT READY FOR GROUT YET |
|
| 02/10/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* ROOF WALL LINE 9-10/L-0; LINE 0/10-8.5 @ 31'4"-34'; M.9-0/8.5; M.5/8-8.5 (M.5/8) OK TO GROUT PROGRESS AREAS SEE DETAIL #325 - NOT APPROVED |
|
| 02/09/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 10 - O TO L TO 32' 2. 8 - R TO P.8 |
|
| 02/05/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* POURING AREA FROM YESTERDAY PUMP BROKE |
|
| 02/04/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 6-Q TO L TO BOND BEAM 2. 10-L TO N L2 LINTELS 3. 8.5 - N.2 TO O.6 4. TO BE SPECIAL INSPECTED |
|
| 02/03/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* WORKING ON 2ND FLOOR OK TO GROUT AREAS WITH SPECIAL INSPECTION |
|
| 02/02/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 12-K TO L TOP OUT 2. 6-Q TO N 3. TO BE SPECIAL INSPECTED |
|
| 01/30/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* Q.5 6.4 TO 8 BOND BEAM NOT COMPLETE PER DETAIL 340 S5.1 |
|
| 01/29/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. L T 7 LINTELS 12-K TO L 2. TOP OUT K - 8 TO 12 |
|
| 01/28/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* K-8 TO 12 TO 30' 10-L TO N.8 TO 8' ABOVE 2ND FLOOR |
|
| 01/27/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. TOP OUT & LT1 LINTELS E-15 TO 18, B-15 TO 18 2. WEST, NORTH AND CENTER WALL TO 8' OFF 2ND FLOOR ELEVATOR C & D |
|
| 01/26/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* | |
| 01/22/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | ALL PROGRESS OK; GROUT DONE TODAY OK | |
| 01/21/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 6 - E.5 TO B.8 TOPOUT |
|
| 01/20/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 6 - O TO L TO 8' 2. K - 10 TO 8 TO 8' 3. K - 5.5 TO 6 TO 12' |
|
| 01/16/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. ELEVATOR SHAFT A WEST AND N.WALL TO 37' EAST WALL TO 35' 2. STAIRWELL C - 2ND FLOOR WEST WALL TO 4' 3. LT7 LINTELS 2ND FLOOR NE CORNER LT11 LINTELS NOT READY |
|
| 01/15/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 6 - 0.5 TO R TO 8'8" P - 6 TO 8 TO 8'8" 8 - M.8 TO R TO 8'8" 9 - C.5 TO G TO 11'4" MAINTAIN CORRECT REBAR LAP |
|
| 01/14/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* L - 5.3 TO 6 TO 8' |
|
| 01/13/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 12-K TO L 4 COLUMNS TO 4 2. 10-K TO N.8 TO 4' 3. ELEVATOR C TO 4' |
|
| 01/12/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 9 - H6 TO K TOP OUT 2. 4 COLUMNS 6-L TO K TO 4' 3. 8 - O TO R TO 4' 4. Q.2 - 8 TO 6.4 5. 6 - Q TO L |
|
| 01/09/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 9 - H.6 TO K TO 20' 2. F-9.5 TO 15 TO 20' 3. 6 COLUMNS AT NE CORNER TO 24' |
|
| 01/08/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. HOSE TOWER TO 20' 2. 4 COLUMN B6 - 6 TO 6.8 TO 24' 3. K - 5.5 TO 6 TO 20' |
|
| 01/07/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 34' @ ELEVATOR & COLS. @ NE OF L2 AND WALL SW L2 |
|
| 01/06/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* LINE 19 - A TO C.8 A - 17 TO 19 TOP |
|
| 01/05/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. C.2 - 17 TO 18.5 TO 8' 2. 8.6 - 18.2 TO 18.8 3. TOP OUT 0.6-8.6 TO 9.6 4. WAITING FOR FIX FROM SCHNEIDER DIAGONAL WALL CJ ON GRID 19 |
|
| 01/02/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) APPERATUS INTERIM WALLS SOUTH AND CENTER TO 12' NORTH TO 8' 2) B-18 TO 19 TO 8' 30 LT7 AT 0.8-8.5 TO 9.5 4) MISSING #5 AT CONTROL JOINTS LINE 19 |
|
| 12/30/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) PARTIAL 0-8.5 TO 9.5 TP 16' |
|
| 12/29/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :8" 1) PARTIAL LT7 0.8-8 TO 9.5 10'-8" TO 12'-8" APPERATUS ROOM 2 EAST TO WEST WALLS TO 8' AND SOUTH WALL 16' TO 20' |
|
| 12/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 2 COLUMNS 0.8-9 AND 9.8 TO 8' NEED TO INSTALL VERTS 2. RUN BOND BEAM FULL LENGTH OF W APPARATUS ROOM WALL |
|
| 12/21/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. WORKING ON LT4 LINTEL 8-15 TO 17 2. 10-L TO N.8 12' TO 16' SPECIAL INSPECTION REY |
|
| 12/18/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 19 - A TO E TO 16' A - 17 TO 19 TO 18' |
|
| 12/17/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. LT4 LINTEL E-15 TO 17 2. 10-L TO M.7 LT2 LINTEL 4 COLUMNS TO 8' 12-K TO L |
|
| 12/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 8 TO 10.5 TO 12' 10-L TO N.8 TO 8' MISSING MC3 COLUMN 2 COLUMNS MCI AT 0.6 9 AND 9.5 |
|
| 12/15/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* ALL PROGRESS OK |
|
| 12/12/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. WEST STAIRWELL ROOM E. WALL TO 16 (S,N,W WALL TO 12') 2. DETAIL CALL FOR LT4 AT DOOR HAS LTI IN PLACE NEED CLARIFICATION |
|
| 12/11/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* B - 9 TO 11 14' TO 18' 17 - A TO B.5 8' TO 12' 9.5 - C TO F 12' TO 16' |
|
| 12/10/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. R-6.1 TO 8 12' TO 16' 8 - 0.8 TO R 12' TO 16' 2. K -- 8 TO 12 4' TO 8' |
|
| 12/09/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* F-9.5 TO 15 16' TO 20' 10 - O TO K 0' TO 4' FOUR COLUMNS 12 - L TO K *DETAIL 233 BOND BEAM AT COURSE CHANGE 8" TO 12" NOT IN PLACE |
|
| 12/08/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* A - 19-17 TO 12'; 17 - C.2 TO E to 8'; C.2 - 17 to 18.5 to 8.1 |
|
| 12/05/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 9.5 - C TO F.2 TO 12' PHIL ON SITE 2. 10 - O TO L TO 4' 3. LT4 B-9 TO 10 |
|
| 12/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. LT4 A.5 11 TO 15 2. 9.5 -- E TO F.5 TO 8' |
|
| 12/02/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 19 - A TO E TO 8' A.2 - 8 TO 9 12 TO 16 |
|
| 12/01/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* LT4 LINTEL F-9.5 TO 15 PHIL ON SITE |
|
| 11/28/2008 | REINFORCED MASONRY PRE-GROUT | Denied | IVRS - Inspection : See detailed listing on site.| 999* GATE LOCKED |
|
| 11/26/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 19 TO 17 A TO E EXTERIOR WALLS TO 4' |
|
| 11/24/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3 3 MCI COLUMNS LINE 17 TO 4'; HOSE TOWER, STORAGE ROOMS TO 4 AND WALL TO 4 LINE E TO B ON 17 |
|
| 11/21/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS @ FAN ROOM 8'8"-10'8", LINE U; STAIRWELL LINE T.5/1-0.5, LINE 1/U-T/5 (DOOR, LT2) OK TO GROUT PROGRESS AREAS |
|
| 11/19/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 12" WALL LINE 6/C TO F @ 10'8" - 14'8"; LINE U/1-2.5 @ 4'-8' (LT2 LINTEL) OK TO GROUT PROGRESS AREAS |
|
| 11/18/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* WALLS @ F-B, LINE 15 -- COLUMNS @ 8'-12', LINE 9-14; 4' TO 8'; LINE 11 - 0'-4'; WALL T.5/1-0/5 @ 4'-8' OK TO GROUT PROGRESS AREAS |
|
| 11/17/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 8" WALL LINE F-C/9.5; 0 - 4; F-E/15 - 2 @ COLUMNS @ 4'-8' LINE B/14 - COLUMN 4'-8'; B/11-9 - 3 @ 0'-4' OK TO GROUT PROGRESS AREAS |
|
| 11/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 12' EXTERIOR BLK. AT SE STAIR WELL AND FAN ROOM 4' TO 8' INSTALL INTERSECTION B OR S 2. APPARATUS BAY 2 SOUTH COLUMNS TO 4' 2 NORTH COLUMNS TO 8' |
|
| 11/12/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. I-P TO T.5 TO 3'4"; SE STAIRWELL TO 4' U-1 TO 2.5 4' 2. MISSING CONTROL JOINT ON LINE 1 FIRST FLOOR |
|
| 11/07/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* B.8 6 TO 6.8 10'8" TO 14'8" |
|
| 11/06/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 8-B4 TO C 32' TO 36' |
|
| 11/05/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. TOP 3 COURSES TO 18' --- 5-E6 TO K 2. 4 COLUMNS B.8 - 6 TO 6.8 TO 12' 3. STEM WALL 17 TO 19 A TO E 8" 4. SPECIAL INSPECTION REQUIRED |
|
| 11/04/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 5-H TO K 12' TO 16' 2. B8 4 COLUMNS TO 8' LINE 6 TO 6.8 |
|
| 11/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. COLUMNS AT B8-6, 6.25, 6.6, 6.8 TO 8' AT A8-11, 13, 14 TO 4' 2. ELEVATOR WALL 8-B.2 TO C TO 31.4 3. TO BE SPECIAL INSPECTED |
|
| 10/30/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1- K TO S 3' HIGH OK TO GROUT |
|
| 10/29/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TO BOTTOM OF LINTEL LINES 24'-28' SHAFT & LOBBY WALL STAIR A AREA (LINE C) |
|
| 10/28/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* MASONRY FOREMAN NOT ON SITE |
|
| 10/24/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* NOT GROUTING TODAY |
|
| 10/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 8 - A TO C 16' TO 20' 7.2 B.3 TO C.2 20' TO 24' B.3 8 TO 7.2 |
|
| 10/21/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 9-H.5 TO G 4' TO 8' 12-C TO F 8' TO 12' N STAIRWELL AND ELEVATOR 16' TO 20' |
|
| 10/20/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* WEST ELEVATOR WALL C TO A LINE 8 |
|
| 10/17/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 1ST LIFT --- 9-H.2 TO A A-9 TO 8 8-A TO C 2. 9-K TO I.5 12' TO 16' OK TO GROUT 3. PHIL TO BE ON SITE FOR GROUT |
|
| 10/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. K-8 TO 12 0' TO 4' 1ST FLOOR 9-K TO H 1ST FLOOR 2. INSTALLING VERTS PHIL TO BE ON SITE |
|
| 10/15/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO POUR LT7 LINTEL 5 - I TO K |
|
| 10/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. WEST WALL SO. ELEVATION 8' TO 12' 2. NORTH ELEVATOR AND STAIRWELL 12' TO 16' 3. PHIL TO BE ON SITE FOR GROUT |
|
| 10/10/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | LOOKED @ MASONRY, FORMS, SCAFFOLDS FOR SLABS; PROGRESS ON C.I.P WALLS ALL PROGRESS OK OK TO PLACE GROUT AND CLOSE C.I.P WALL WHEN SP. INSP. CONFIRMS |
|
| 10/09/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. STAIRWELL C-D 8' ABOVE 1ST FLOOR LT1 2. ELEVATOR STAIRWELL B-A SEPARATION WALL AND SOUTH WALL TO 8' 3. PROVIDE EPOXY REBAR AT CMU INTERSECTIONS 48 O.C |
|
| 10/08/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 14'8" ABOVE FF 6-L TO K, LT7 S1.4 ELEVATOR SHAFT 4' ABOVE 1ST FLOOR |
|
| 10/06/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT 5 - L TO O 2ND LIFT FOR COLUMNS @ 6 & 6.5 BETWEEN K & L |
|
| 10/01/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* N TO R ON 5 1ST LIFT R 6 & 8 1ST LIFT PHIL ON SITE |
|
| 09/30/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | R TO K TO 4' PHIL TO BE ON SITE |
|
| 09/29/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. WORKING ON K TO R - 1ST FLOOR -- 1ST LIFT 2. CONCRETE AT VENT SHAFTS -- FLOORS ONLY (252) S4.2 |
|
| 09/25/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. RM. P104 0' TO 4' VERTS NOT IN YET 2. VENT SHAFT RM. P101 4' TO 8' 3. N COMMUNICATIONS WALL TO 8' - OK BY SCHNEIDER 4. GROUTING ANCHOR BOLTS AT THE 3 NE COLUMNS 236 S4.1 PHIL TO BE ON SITE |
|
| 09/24/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* WORKING ON P101A, VENT SHAFT AT P101, P104 GROUTED P113 TO 4' 6 C TO F 10' TO 14' E.5 5 TO 6 12' TO 16' |
|
| 09/22/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. EAST WALL CMU FROM CORNER TO CONTROL JOINT 12' TO 16' 2. NORTH ELEVATOR WALL INTERIOR LOWER LEVEL ELEVATION 96 TO 100 3. TO BE SPECIAL INSPECTED |
|
| 09/19/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SOUTH ELEVATION 16' TO 20' NORTH COMMUNICATIONS WALL TOP OUT |
|
| 09/18/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST FLOOR CMU WALL 4' TO 8' LINE 5 -- E.5 TO I LINE 6 -- C.2 TO F.5 LINE C.2 -- 6 TO 7 |
|
| 09/17/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. N & E WALL AT ELEVATION PIT 1ST LIFT ABOVE 1ST FLOOR 2. E.WALL E.8 TO J 3. N VENT SHAFT 10' TO 14' |
|
| 09/12/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. VENT SHAFT N OF LINE K - 8' TO 12' PRE-GROUT 2. MECH. ROOM 6' TO 10' |
|
| 09/04/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. ELEVATION AT 10' WITH FLOOR DOWELS AND LEDGER ANGLE 2. FAN ROOM WALLS INTERIOR WALLS 4' TO 8' EXTERIOR 4' TO 6' 3. PHIL ON SITE |
|
| 09/03/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 09/02/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* BLOCK FOREMAN NOT ON SITE MAINTAIN 3 BARS AT CORNERS 1. POURING WALL #16 - PHIL ON SITE |
|
| 08/21/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT P202, EXT. WALLS P200B 2ND LIFT P203A 1. PHIL TO BE ON SITE FOR GROUT AND EPOXY OF REBAR |
|
| 08/20/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT AT MECHANICAL RM P203A 1. POURING REMAINING 2 CC1 COLUMNS PHIL ON SITE |
|
| 08/19/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SOUTH STAIRWELL AND ELEVATOR 2ND LIFT TO BE GROUTED SOLID 1. LL N&S STORAGE WALLS 1ST LIFT OK TO GROUT PHIL TO INSPECT EPOXIED REBAR |
|
| 08/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* DETAIL 144 S3.1 FOR 1ST LIFT AT ELEVATOR DETAIL 119 S3.0 1ST LIFT LINE 4 M2 TO P7 AIR HANDLER ROOM |