Permit: T07CM03770

Parcel: 11713069E

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
08/18/2009 REINFORCED MASONRY PRE-GROUT Approved IVRS - Inspection :*
08/17/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT REMAINING SITE WALL NORTH WEST CORNER
08/05/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT WEST SIDE FROM GATE TO 2ND EXPANSION
08/04/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) TOP OUT RADIUS WALL FROM BLDG TO CONTROL JOINT POST RADIUS
07/31/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT FOR 8' SCREEN WALL WEST SIDE CENTER VERTS IN CELLS
06/04/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
INFILL ABOVE NORTH ELEVATOR TO BE SPECIAL INSPECTED
SK-36 THRU 41
04/01/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
RFI 385 FIX FOR NORTH WINDOW OPENINGS
03/31/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
SITE WALL AT NE CORNER TO 4'
03/27/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. EAST SIGHT WALL NORTH END TO 4'
2. APPARATUS BAY SW CORNER AT STAIRS TOP OUT TO BE SPECIAL INSPECTED
03/26/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 18-E TO C.4 4' ABOVE 2ND FLOOR
E 17 TO 18 4' ABOVE FLOOR
2. SOUTH CORNER OF WE SITE WALL TOP OUT
3. INSTALLING VERTS TO BE SPECIAL INSPECTED
03/20/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
WORKING ON EAST SITE WALL
03/19/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
LT7 LINTELS AT LINE 6 AND 0.5
03/18/2009 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
03/17/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. MISSING WELD PLATES 9-A.8 TO B4 TOPOUT
2. 9.5-C.5 TO F
3. 2ND LIFT EAST SITE WALL
03/16/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TOP OUT 2ND FLOOR WEST WALL APP ROOM
03/13/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
80' OF EAST SITE WALL TOP OUT
03/12/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
EAST SITE WALL 1 #4 GRADE LEVEL BOND BEAM TO 4'8"
03/11/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
A.2 - B.8 30' TO 34'
18 - B TO C TO 8' WITH LT1
17 LT1 LINTEL
03/10/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 60' OF E.SIDE WALL TO 4'8"
2. 8 - A TO B5 12' ABOVE 2ND FLOOR 9 - A TO B5
3. 16.5 - E TO C ABOVE 2ND FLOOR
03/05/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 18-C.8 TO B 4' AFF
2. A.2 - 8 TO 9 8' AFF AND RETURN WALLS
03/04/2009 REINFORCED MASONRY PRE-GROUT Cancelled IVRS - RI canceled
03/03/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
HOSE APPARATUS ROOM 5 WALL 6 COURSES FROM TOP OUT
03/02/2009 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
WORKING FIRE POLE ROOM
02/28/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
K-8 TO 9
TOP OUT
02/26/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
02/26/2009 REINFORCED MASONRY PRE-GROUT Partial Approval 1. WORKING ON 5.4 L TO K LT-7
NO BLOCK LAYED YET
2. C.2 - 6 TO 6.8 TO 14" FROM DECK
02/25/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 2 EAST COLUMNS ON 2ND FLOOR EXT. BALCONY TO 8'
2. PHIL ON SITE
02/24/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. SOUTH STAIRWELL W&S WALL TOP OUT
2. MC1 COLUMNS 5.5 - L TO K 4' TO 8'
3. A.2-8 TO 9 TO 4'
4. PHIL ON SITE
02/20/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. LT7 LINTELS C.3-6 TO 6.8
2. 2 COLUMNS TO 20' 5.4 L TO K
3. 2ND FLOOR WING WALLS TO 8' LINES 11 & 15
4. 2ND FLOOR 17-E TO C TO 4'
02/19/2009 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
02/18/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
F-9.5 TO 15 LT1 LINTEL AND TOP BOND BEAM
02/17/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
3 INTERIOR COLUMNS C.25 6 TO 6.8
02/13/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
NOTHING READY FOR GROUT; BRICK TOPPING & INFILL & COL. PROGRESS OK
02/12/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) LINTELS ON EAST; TOP AT WEST; COL AND 4' INFILL
02/11/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
PROGRESS ONLY NOT READY FOR GROUT YET
02/10/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ROOF WALL LINE 9-10/L-0; LINE 0/10-8.5 @ 31'4"-34'; M.9-0/8.5; M.5/8-8.5 (M.5/8) OK TO GROUT PROGRESS AREAS
SEE DETAIL #325 - NOT APPROVED
02/09/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 10 - O TO L TO 32'
2. 8 - R TO P.8
02/05/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
POURING AREA FROM YESTERDAY PUMP BROKE
02/04/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 6-Q TO L TO BOND BEAM
2. 10-L TO N L2 LINTELS
3. 8.5 - N.2 TO O.6
4. TO BE SPECIAL INSPECTED
02/03/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
WORKING ON 2ND FLOOR
OK TO GROUT AREAS WITH SPECIAL INSPECTION
02/02/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 12-K TO L TOP OUT
2. 6-Q TO N
3. TO BE SPECIAL INSPECTED
01/30/2009 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
Q.5 6.4 TO 8
BOND BEAM NOT COMPLETE PER DETAIL 340 S5.1
01/29/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. L T 7 LINTELS 12-K TO L
2. TOP OUT K - 8 TO 12
01/28/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
K-8 TO 12 TO 30'
10-L TO N.8 TO 8' ABOVE 2ND FLOOR
01/27/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. TOP OUT & LT1 LINTELS E-15 TO 18, B-15 TO 18
2. WEST, NORTH AND CENTER WALL TO 8' OFF 2ND FLOOR
ELEVATOR C & D
01/26/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
01/22/2009 REINFORCED MASONRY PRE-GROUT Partial Approval ALL PROGRESS OK; GROUT DONE TODAY OK
01/21/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
6 - E.5 TO B.8 TOPOUT
01/20/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 6 - O TO L TO 8'
2. K - 10 TO 8 TO 8'
3. K - 5.5 TO 6 TO 12'
01/16/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. ELEVATOR SHAFT A WEST AND N.WALL TO
37' EAST WALL TO 35'
2. STAIRWELL C - 2ND FLOOR WEST WALL TO 4'
3. LT7 LINTELS 2ND FLOOR NE CORNER
LT11 LINTELS NOT READY
01/15/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
6 - 0.5 TO R TO 8'8"
P - 6 TO 8 TO 8'8"
8 - M.8 TO R TO 8'8"
9 - C.5 TO G TO 11'4"
MAINTAIN CORRECT REBAR LAP
01/14/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
L - 5.3 TO 6 TO 8'
01/13/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 12-K TO L 4 COLUMNS TO 4
2. 10-K TO N.8 TO 4'
3. ELEVATOR C TO 4'
01/12/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 9 - H6 TO K TOP OUT
2. 4 COLUMNS 6-L TO K TO 4'
3. 8 - O TO R TO 4'
4. Q.2 - 8 TO 6.4
5. 6 - Q TO L
01/09/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 9 - H.6 TO K TO 20'
2. F-9.5 TO 15 TO 20'
3. 6 COLUMNS AT NE CORNER TO 24'
01/08/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. HOSE TOWER TO 20'
2. 4 COLUMN B6 - 6 TO 6.8 TO 24'
3. K - 5.5 TO 6 TO 20'
01/07/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
34' @ ELEVATOR & COLS. @ NE OF L2 AND WALL SW L2
01/06/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
LINE 19 - A TO C.8
A - 17 TO 19 TOP
01/05/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. C.2 - 17 TO 18.5 TO 8'
2. 8.6 - 18.2 TO 18.8
3. TOP OUT 0.6-8.6 TO 9.6
4. WAITING FOR FIX FROM SCHNEIDER DIAGONAL WALL CJ ON GRID 19
01/02/2009 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) APPERATUS INTERIM WALLS SOUTH AND CENTER TO 12' NORTH TO 8'
2) B-18 TO 19 TO 8'
30 LT7 AT 0.8-8.5 TO 9.5
4) MISSING #5 AT CONTROL JOINTS LINE 19
12/30/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) PARTIAL 0-8.5 TO 9.5 TP 16'
12/29/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :8"
1) PARTIAL LT7 0.8-8 TO 9.5 10'-8" TO 12'-8" APPERATUS ROOM 2 EAST TO WEST WALLS TO 8' AND SOUTH WALL 16' TO 20'
12/23/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 2 COLUMNS 0.8-9 AND 9.8 TO 8' NEED TO INSTALL VERTS
2. RUN BOND BEAM FULL LENGTH OF W APPARATUS ROOM WALL
12/21/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. WORKING ON LT4 LINTEL 8-15 TO 17
2. 10-L TO N.8 12' TO 16'

SPECIAL INSPECTION REY
12/18/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
19 - A TO E TO 16'
A - 17 TO 19 TO 18'
12/17/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. LT4 LINTEL E-15 TO 17
2. 10-L TO M.7 LT2 LINTEL
4 COLUMNS TO 8' 12-K TO L
12/16/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8 TO 10.5 TO 12'
10-L TO N.8 TO 8' MISSING MC3 COLUMN
2 COLUMNS MCI AT 0.6
9 AND 9.5
12/15/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ALL PROGRESS OK
12/12/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. WEST STAIRWELL ROOM E. WALL TO 16 (S,N,W WALL TO 12')
2. DETAIL CALL FOR LT4 AT DOOR HAS LTI IN PLACE
NEED CLARIFICATION
12/11/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
B - 9 TO 11 14' TO 18'
17 - A TO B.5 8' TO 12'
9.5 - C TO F 12' TO 16'
12/10/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. R-6.1 TO 8 12' TO 16'
8 - 0.8 TO R 12' TO 16'
2. K -- 8 TO 12 4' TO 8'
12/09/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
F-9.5 TO 15 16' TO 20'
10 - O TO K 0' TO 4'
FOUR COLUMNS 12 - L TO K

*DETAIL 233 BOND BEAM AT COURSE CHANGE 8" TO 12"
NOT IN PLACE
12/08/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
A - 19-17 TO 12';
17 - C.2 TO E to 8';
C.2 - 17 to 18.5 to 8.1
12/05/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 9.5 - C TO F.2 TO 12'
PHIL ON SITE
2. 10 - O TO L TO 4'
3. LT4 B-9 TO 10
12/03/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. LT4 A.5 11 TO 15
2. 9.5 -- E TO F.5 TO 8'
12/02/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
19 - A TO E TO 8'
A.2 - 8 TO 9
12 TO 16
12/01/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
LT4 LINTEL
F-9.5 TO 15
PHIL ON SITE
11/28/2008 REINFORCED MASONRY PRE-GROUT Denied IVRS - Inspection :
See detailed listing on site.| 999*
GATE LOCKED
11/26/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
19 TO 17 A TO E EXTERIOR WALLS TO 4'
11/24/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
3 3 MCI COLUMNS LINE 17 TO 4'; HOSE TOWER, STORAGE ROOMS TO 4 AND WALL TO 4 LINE E TO B ON 17
11/21/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALLS @ FAN ROOM 8'8"-10'8", LINE U; STAIRWELL LINE T.5/1-0.5, LINE 1/U-T/5 (DOOR, LT2)
OK TO GROUT PROGRESS AREAS
11/19/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12" WALL LINE 6/C TO F @ 10'8" - 14'8";
LINE U/1-2.5 @ 4'-8' (LT2 LINTEL)
OK TO GROUT PROGRESS AREAS
11/18/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
WALLS @ F-B, LINE 15 -- COLUMNS @ 8'-12',
LINE 9-14; 4' TO 8'; LINE 11 - 0'-4'; WALL T.5/1-0/5 @ 4'-8'

OK TO GROUT PROGRESS AREAS
11/17/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8" WALL LINE F-C/9.5; 0 - 4; F-E/15 - 2 @ COLUMNS @ 4'-8'
LINE B/14 - COLUMN 4'-8'; B/11-9 - 3 @ 0'-4'
OK TO GROUT PROGRESS AREAS
11/14/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 12' EXTERIOR BLK. AT SE STAIR WELL AND FAN ROOM
4' TO 8' INSTALL INTERSECTION B OR S
2. APPARATUS BAY 2 SOUTH COLUMNS TO 4'
2 NORTH COLUMNS TO 8'
11/12/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. I-P TO T.5 TO 3'4"; SE STAIRWELL TO 4' U-1 TO 2.5 4'
2. MISSING CONTROL JOINT ON LINE 1 FIRST FLOOR
11/07/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
B.8 6 TO 6.8 10'8" TO 14'8"
11/06/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 8-B4 TO C 32' TO 36'
11/05/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. TOP 3 COURSES TO 18' --- 5-E6 TO K
2. 4 COLUMNS B.8 - 6 TO 6.8 TO 12'
3. STEM WALL 17 TO 19 A TO E 8"
4. SPECIAL INSPECTION REQUIRED
11/04/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 5-H TO K 12' TO 16'
2. B8 4 COLUMNS TO 8' LINE 6 TO 6.8
11/03/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. COLUMNS AT B8-6, 6.25, 6.6, 6.8 TO 8' AT A8-11, 13, 14 TO 4'
2. ELEVATOR WALL 8-B.2 TO C TO 31.4
3. TO BE SPECIAL INSPECTED
10/30/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1- K TO S
3' HIGH OK TO GROUT
10/29/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TO BOTTOM OF LINTEL LINES
24'-28' SHAFT & LOBBY WALL STAIR A AREA (LINE C)
10/28/2008 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
MASONRY FOREMAN NOT ON SITE
10/24/2008 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
NOT GROUTING TODAY
10/23/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8 - A TO C 16' TO 20'
7.2 B.3 TO C.2 20' TO 24'
B.3 8 TO 7.2
10/21/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
9-H.5 TO G 4' TO 8' 12-C TO F 8' TO 12'
N STAIRWELL AND ELEVATOR 16' TO 20'
10/20/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
WEST ELEVATOR WALL C TO A LINE 8
10/17/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 1ST LIFT --- 9-H.2 TO A A-9 TO 8 8-A TO C
2. 9-K TO I.5 12' TO 16' OK TO GROUT
3. PHIL TO BE ON SITE FOR GROUT
10/16/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. K-8 TO 12 0' TO 4' 1ST FLOOR
9-K TO H 1ST FLOOR
2. INSTALLING VERTS PHIL TO BE ON SITE
10/15/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO POUR LT7 LINTEL
5 - I TO K
10/14/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. WEST WALL SO. ELEVATION 8' TO 12'
2. NORTH ELEVATOR AND STAIRWELL 12' TO 16'
3. PHIL TO BE ON SITE FOR GROUT
10/10/2008 REINFORCED MASONRY PRE-GROUT Partial Approval LOOKED @ MASONRY, FORMS, SCAFFOLDS FOR SLABS;
PROGRESS ON C.I.P WALLS

ALL PROGRESS OK
OK TO PLACE GROUT AND CLOSE C.I.P WALL WHEN SP. INSP. CONFIRMS
10/09/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. STAIRWELL C-D 8' ABOVE 1ST FLOOR LT1
2. ELEVATOR STAIRWELL B-A SEPARATION WALL AND SOUTH WALL TO 8'
3. PROVIDE EPOXY REBAR AT CMU INTERSECTIONS 48 O.C
10/08/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
14'8" ABOVE FF 6-L TO K, LT7 S1.4
ELEVATOR SHAFT 4' ABOVE 1ST FLOOR
10/06/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2ND LIFT
5 - L TO O
2ND LIFT FOR COLUMNS @ 6 & 6.5 BETWEEN K & L
10/01/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
N TO R ON 5 1ST LIFT R 6 & 8 1ST LIFT
PHIL ON SITE
09/30/2008 REINFORCED MASONRY PRE-GROUT Partial Approval R TO K TO 4'
PHIL TO BE ON SITE
09/29/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. WORKING ON K TO R - 1ST FLOOR -- 1ST LIFT
2. CONCRETE AT VENT SHAFTS -- FLOORS ONLY

(252) S4.2
09/25/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. RM. P104 0' TO 4' VERTS NOT IN YET
2. VENT SHAFT RM. P101 4' TO 8'
3. N COMMUNICATIONS WALL TO 8' - OK BY SCHNEIDER
4. GROUTING ANCHOR BOLTS AT THE 3 NE COLUMNS 236 S4.1
PHIL TO BE ON SITE
09/24/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
WORKING ON P101A, VENT SHAFT AT P101, P104

GROUTED P113 TO 4'
6 C TO F 10' TO 14'
E.5 5 TO 6 12' TO 16'
09/22/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. EAST WALL CMU FROM CORNER TO CONTROL
JOINT 12' TO 16'
2. NORTH ELEVATOR WALL INTERIOR LOWER LEVEL ELEVATION 96 TO 100
3. TO BE SPECIAL INSPECTED
09/19/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
SOUTH ELEVATION 16' TO 20'
NORTH COMMUNICATIONS WALL TOP OUT
09/18/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1ST FLOOR CMU WALL 4' TO 8'

LINE 5 -- E.5 TO I
LINE 6 -- C.2 TO F.5
LINE C.2 -- 6 TO 7
09/17/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. N & E WALL AT ELEVATION PIT 1ST LIFT ABOVE 1ST FLOOR
2. E.WALL E.8 TO J
3. N VENT SHAFT 10' TO 14'
09/12/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. VENT SHAFT N OF LINE K - 8' TO 12' PRE-GROUT
2. MECH. ROOM 6' TO 10'
09/04/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. ELEVATION AT 10' WITH FLOOR DOWELS AND
LEDGER ANGLE
2. FAN ROOM WALLS INTERIOR WALLS 4' TO 8'
EXTERIOR 4' TO 6'
3. PHIL ON SITE
09/03/2008 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
09/02/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
BLOCK FOREMAN NOT ON SITE
MAINTAIN 3 BARS AT CORNERS

1. POURING WALL #16 - PHIL ON SITE
08/21/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1ST LIFT P202, EXT. WALLS P200B
2ND LIFT P203A

1. PHIL TO BE ON SITE FOR GROUT AND EPOXY OF REBAR
08/20/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2ND LIFT AT MECHANICAL RM P203A

1. POURING REMAINING 2 CC1 COLUMNS

PHIL ON SITE
08/19/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
SOUTH STAIRWELL AND ELEVATOR 2ND LIFT TO BE
GROUTED SOLID

1. LL N&S STORAGE WALLS 1ST LIFT OK TO GROUT PHIL TO INSPECT EPOXIED REBAR
08/14/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
DETAIL 144 S3.1 FOR 1ST LIFT AT ELEVATOR
DETAIL 119 S3.0 1ST LIFT LINE 4 M2 TO P7
AIR HANDLER ROOM