Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2009 | BUILDING PRE-SLAB | Approved | IVRS - Inspection :* 1) COMPLIANT PER SCHNEIDER |
|
| 07/21/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) APPERATUS BAY DRIVE SLIP DOWELS IN PLACE |
|
| 05/01/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* NE STAIRWELL LANDING 6X6 WW |
|
| 03/05/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* ELEVATED SLAB 1ST FLOOR BATH WW IN PLACE |
|
| 02/24/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1. REMAINING APPARATUS BAY SLAB 2. SPECIAL INSPECTED ONLY OK PER LEERAY |
|
| 02/20/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 3 ALTERNATE BAYS IN APPARATUS BAY |
|
| 02/12/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* | |
| 02/11/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* PRE-SLAB OK @ KIOSK |
|
| 01/29/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* WORKING ON 2ND FLOOR APPARATUS DECK PHIL ON SITE WELDING SPECIAL INSPECTED |
|
| 01/08/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* L2 SOUTH OF K BY LEERAY YESTERDAY |
|
| 01/07/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* L2 FROM K-LINE SOUTH |
|
| 12/19/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* PRE-SLAB ON DECK 2ND FLOOR NORTH 1/2 NEEDS SPECIAL INSPECTIONS STILL WORKING ON WELDED WIRE |
|
| 12/05/2008 | BUILDING PRE-SLAB | Partial Approval | 1. LOADING DOCK RAMP DETAIL 153 S3.2 2. PILL BOXES DETAIL 251 |
|
| 11/25/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* POURING K TO O 8 TO 10 SCHNEIDER ON SITE |
|
| 11/24/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* WORKING ON FLOOR LOCKER BATHROOM AREA |
|
| 11/05/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1. LEVEL 1 PARKING SOUTH 1/2 AND RAMP SPECIAL INSPECTED |
|
| 10/20/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1. WORKING ON FINISHING LEVEL 1 PARKING DECK TO POUR AT 1:00 AM 2. PHIL TO BE ON SITE 3. P.5 TO K |
|
| 10/10/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* POURING 1ST FLOOR 6.5 TO K 8 TO 9 |
|
| 09/25/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* POURED LEVEL 1 J TO R LINE PHIL WAS ON SITE AT MIDNIGHT |
|
| 09/22/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* WORKING ON LL1 SOUTH 1/2 OF DECK |
|
| 09/10/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* WORKING ON DECK POUR N END TO LINE H 1. POURING WALL 17 (PHIL ON SITE) |
|
| 08/07/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) POURING N ELEVATOR STAIRWELL SLAB, POURING SLAB N OF AIR HANDLER ROOM 2) FINISHING STEEL ON LOWER LEVEL DECK POURING AT 12 AM PHIL WILL BE ON SITE |
|
| 08/06/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) POURING AIR HANDLER PAD AHU4 AND AIR HANDLER ROOM WALLS AND VERT SHAFT, GRADE BEAMS CONFORMATIC AND PHIL ON SITE |
|
| 08/05/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* WORKING ON 1ST FLOOR DECK AND AIR HANDLER WALLS |
|
| 08/04/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* WORKING ON LOWER LEVEL DECK AIR HANDLERS ROOM STEM WALLS INCOMPLETE 1. MAINTAIN REBAR CLEARANCE 2. 1ST TO 2ND FLOOR COLUMN REBAR TO BE REPLACED |
|
| 07/30/2008 | BUILDING PRE-SLAB | Partial Approval | STILL TYING STEEL FOR LEVEL ONE DECK. INSPECTOR PHIL HAYWARD TO BE ON SITE AT 1PM. | |
| 07/30/2008 | BUILDING PRE-SLAB | Partial Approval | ELEVATED SLAB C-1/5-8 FIRST LEVEL OK | |
| 04/30/2008 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* |