Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07CM03770

Parcel: 11713069E

Inspection Status: Approved

Inspection History: STEM WALL/RETAINING WALL

Date Description Inspector Results Comments
09/03/2009 STEM WALL/RETAINING WALL Approved IVRS - Inspection :*
07/09/2009 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1) STEM WALL AT MEMORIAL DETAIL 136
05/26/2009 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
MEMORIAL WALLS (REBAR) AS PER DETAIL #137; PAGE S3.1
OK TO POUR RETAINING WALLS
05/07/2009 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
MEMORIAL WALL @ N/E CORNER REINFORCEMENT STEEL
OK TO POUR
01/16/2009 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
S3.1 (138) GAZEBO STEM WALL
12/16/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
COMPLETE RAMP 153 ON S3.2
12/15/2008 STEM WALL/RETAINING WALL Partial Approval ALL PROGRESS OK
12/12/2008 STEM WALL/RETAINING WALL Not ready for Inspection IVRS - Inspection :*
WORKING ON AIR SHAFT 1 TO 2 -- K TO K.3 AND WEST RAMP
12/09/2008 STEM WALL/RETAINING WALL Not ready for Inspection IVRS - Inspection :*
12/08/2008 STEM WALL/RETAINING WALL Not ready for Inspection IVRS - Inspection :*
10/10/2008 STEM WALL/RETAINING WALL Partial Approval 1. 2 WEST VENT SHAFT WALLS OK TO POUR
2. CLOSING UP POUR 23
3. SETTING & POURING CAISSONS
4. PHIL ON SITE
10/01/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON WALL POUR 24, AND GRADE BEAM FOR 23
09/30/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
09/24/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON SOUTH 1/2 OF DECK POUR
PHIL TO BE ON SITE
09/19/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
RADIUS POUR 18 CLOSED UP
PHIL ON SITE WORKING ON POUR 25
WANTING TO POUR ALL 50
09/18/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WEST 1/2 OF POUR 18-RADIUS OK TO CLOSE UP WEST 1/2 NEED TO EPOXY #7 REBAR ON EAST END PHIL ON SITE
09/17/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON RADIUS WALL POUR 18
09/12/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1. WALL POUR 21 PHIL ON SITE
LINE K 2.5 TO 5
09/09/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON CLOSING UP WALL 17 AND INSTALLING CHIMS

1. FINISHING UP DECK REBAR FOR POUR FROM NORTH END TO LINE H
2. PHIL ON SITE REVIEWED PENDING DEFICIENCIES
09/08/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON WEST RADIUS WALL (17) AND DECK REBAR

1. NEED TO SEE RFI's FOR DEFICIENCIES ON SPECIAL
REPORT NO.95
09/03/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
OK TO PROGRESS
08/27/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
RAMP WALL #16 -- OK TO CLOSE
08/19/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
SETTING LAST CC1 COLUMN FORMS LL ONE
08/18/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1. STEEL IN PLACE FOR CC1 ON LINE 7 - Q AND P
2. WORKING ON 2ND LIFT AT ELEVATOR SHAFT
3. GROUTING REMAINING 1ST LIFT AT FAN ROOM
08/14/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1. MAINTAIN CLEARANCE WHEN SETTING FORMS

REBAR IN PLACE FOR CC1 & CC2 COLUMNS
08/13/2008 STEM WALL/RETAINING WALL Partial Approval 1. POURED 6 LEVEL 2 CC1 COLUMNS PHIL ON SITE
2. WORKING ON ELEVATOR AND FAN ROOM 1ST LIFT BLOCK WALL
3. ELEVATOR ONLY 1ST TWO LIFTS WITH KNOCKOUTS
08/12/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
DETAIL 143A S3.1 CC1 7 AT NORTH END OF LOWER LEVEL 2

1. INSTALL MISSING CHAIRS FOR CLEARANCE
07/29/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON REBAR FOR DECK POUR
SPECIAL INSPECTOR HERE FOR EPOXY OF REBAR
07/25/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
LINE 9/A-F; LINE A/8-9; LINE 8/A-B.5
07/22/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1. POURING VENTILATION ROOM EQUIP. MAT PADS
2. POURING SLAB AND GRADE BEAMS FOR ROOM P206
3. SPECIAL INSPECTORS ON SITE
4. WORKING ON WALLS FOR POUR 14, 15
07/21/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1. WORKING ON PANELS FOR POUR 14 & 15
2. WORKING ON GB1 AT ELEVATOR SHAFT
3. WORKING ON EQUIP. MATTS FOR VENTILATION ROOM
4. PHIL TO WITNESS EPOXY OF GB REBAR
07/18/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON VENT SHAFT SLABS AND ELEVATOR SHAFT
GB AND MONO-POUR

1. HAVE PHILL CALL IF REBAR COMPLETE 909-5184
07/17/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
SETTING PANELS FOR POUR 15 AND 14
07/16/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
POURING POUR 12 CTECH & SCHNEIDER ON SITE
07/15/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON POUR 13 W3 & W1 WALL
INSTALL #5 TRIM BARS AT BLOCK OUT S1.1 (32)
PHIL TO BE ON SITE BEFORE CLOSING UP
PENDING #3 REPORT 50
07/14/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON WALLS FOR POUR 13

1. AIR SUPPLY DUCTS ASCU IN POUR 12
07/11/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
RAINED OUT STILL WORKING ON POUR 13 WALLS
07/09/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
STRIPPING POUR 12, POURING 2 CAISSONS BRAIN AND PHIL
TO BE ON SITE
07/08/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
POURING #12 W-3 & W-4 WALLS

2. C TECH & SCHNEIDER ON SITE
3. TAG FF4 CAISSONS
07/07/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON W4 & 3 WALLS FOR POUR 12
PHIL ON SITE
07/03/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON POUR 12
INSTALLING BLOCK OUTS
NEEDS EXTRA TRIM BARS
07/02/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON N.WALL OF POUR 12
TAGGED 2 CF4 CAISSONS
DRILL CAISSON CONFORMATEC ON SITE
07/01/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
WORKING ON POUR 12 W4 & W3 WALLS
06/30/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
POURED LOWER SLAB 1:00 AM
WORKING ON POUR 12 WALLS
SCHNEIDER REPORT 50 #3 STILL PENDING
06/27/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
LOWER LEVEL SLAB RAINED OUT POURING POUR #11
CONCRETE WALL
PHIL ON SITE
06/25/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
POUR 22 OK TO BUTTON UP TRIM BARS AND #7 + 5's IN PLACE
SPECIAL INSPECTED
06/24/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
POUR 22 NEEDS #5 TRIM BARS (32)
CARRY #7 & 5 THRU BULK HEAD

POURING #10 PHIL AND CONFORMA TECH ON SITE
06/23/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
POUR 22, 10 WORKING ON REBAR (22)
BUTTONING UP (10)
POURING 10
06/20/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1. WORKING ON POUR 10 WALL O TO M
EPOXY BOLTS TO BE OBSERVED BY PHIL
2. POURING VENTILATION SHAFTS PHIL O SITE
3. WORKING ON WALL POUR 22 M.5 TO R
06/19/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
ENCLOSING AIR SHAFTS FOR POUR 6-20
WORKING ON WALL POUR 10
06/18/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
POURING M.5 TO R LINE 1

WORKING ON VENT SHAFT WALLS
ADDING 1 MORE #5 VERT
06/17/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1. REBAR IN PLACE COLUMNS P&S LINE 3
2. POURING WALL LINE 8 0 TO 8
3. WORKING ON WALL LINE 1 R TO M.5
06/16/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
PENDING CAISSON COVE IN #3 REPORT 50 FROM SCHNEIDER

1. WORKING ON WALL O TO L LINE 8
2. WORKING ON WALL M.5 TO R LINE 1
06/13/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1. COLUMNS 2 AT T -- 3 AT 5 -- NEEDS CLEARANCE
2. INSTALLING MASONRY STEEL IN WALL 1 TO 0.2
3. INSTALLING STEEL AT VENTILATION SHAFT
06/12/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
K TO M.5 LINE
WORKING ON PLACING REBAR
NEED RFI FOR CHANGE TO DETAIL 227
06/11/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
POURING W1 LL P TO R
GB LL K.2 1 TO 2
LINE 8 3 NORTH GB1

CONFORMATECH & SCHNEIDER ON SITE
06/10/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1. POURING 6 CAISSONS SCHNEIDER AND CONFORMATECH
ON SITE
2. INSTALLING CORNER BARS AT 0.6 LINE 8
3. GB1 AT K.2 1 TO 2 REPAIRED
06/09/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
0.5 TO R WORKING ON STEEL
OK TO PROGRESS
06/06/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
TAGGED CAISSONS, NO POUR, REPAIRING GRADE BEAMS WITH VERTS TURNED INTO WALL PER RFI
06/05/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
POURING GB2 & GB1 PHIL ON SITE
CHECKING ON FLOATING END OF GB1 WITH ENGINEER
06/03/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
OK TO POUR 6 CONCRETE COLUMN 5 LINE 2
OK TO CLOSE UP 4 COLUMNS LINE 3
OK TO CLOSE UP WALL C TO H LINE 8
05/30/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
LINE 8 - B TO H.5/OK TO CLOSE COLUMNS LINE 2, LINE 3/M-T
05/29/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
FIELD OBSERVATION ONLY - NOTHING 100% READY
OK TO CLOSE BOTTOM 4' AT ELEVATOR PIT
05/22/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
1) POURING ELEVATOR WALLS, PHIL FROM SCHNEIDER ON SITE
05/20/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
OVERHANG ON LAST POUR IN PLACE COLUMNS
EAST AND NORTH WALLS AROUND ELEVATOR
REBAR OK
05/15/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
GRADE BEAM 1' AROUND ELEVATOR SHAFT OK TO POUR
INTERIOR COLUMNS C-1 E, G, H, N, M C-2 L
05/13/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
LINE E.5 TO 6
6-C.2-E8
6 TO 6.8 LINE C.2
OK TO BUTTON UP
05/12/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
SCHNEIDER REPORT 5-8 GB1 DOWEL DEF. CORRECTED BY CHIPPING BACK CONCRETE

1. POUR IN PLACE COLUMNS BEING FITTING WITH CHAIRS TO PROVIDE CLEARANCE
2. TAGGED CAISSONS
05/09/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
ELEVATOR STEM PER PLAN VERTS BEING INSTALLED PER W-2

1. #4 15 OC HOOP RINGS

TAGGED CAISSONS CF3 & CF4
05/06/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
INSTALLING TOP VERTS OK TO BUTTON UP WITH SPECIAL INSPECTOR -- LINE 5 K.5 H.5
05/02/2008 STEM WALL/RETAINING WALL Not ready for Inspection IVRS - Inspection :*
05/01/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
OBSERVED WALL POUR
0.2 TO R 5 TO 6

TAGGED CAISSONS CF4
SCHNEIDER & CONFORMATECH ON SITE
04/30/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
GB.5
NO #4 HOOP TIES 15" OC (IN PEMOCKO)
NEED CLARIFICATION
ELEVATOR SHAFT FOOTING OK TO POUR
OK 0.3 TO G-R OK TO BUTTON UP
SPECIAL INSPECTOR ON SITE
04/29/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
PROGRESS OK ON CIP WALL
TAGGED TYPE 3 AND 4 CAISSONS
GRADE BEAM B.3 - 7 TO 8
04/28/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
TAGGED TYPE 6 CAISSON
WALL PANELS R TO Q LINE 6
5 TO 6 LINE P.8
04/24/2008 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*
SPECIAL INSPECTED TO VERIFY THAT JAMB BARS GO TOP TO BOTTOM
04/23/2008 STEM WALL/RETAINING WALL Partial Approval PROGRESS OK ON CIP WALL BUT NOT READY TO CLOSE