Permit: T07CM03323

Parcel: 140420940

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T07CM03323

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
03/18/2008 ENGINEERING - FINAL Approved Contractor provided revised approved drawings.
03/03/2008 ENGINEERING - FINAL Not ready for Inspection Contractor needs to address details 23 and 24 on sheet A5.0, at 201 North Stone.
12/27/2007 ENGINEERING - FINAL Partial Approval O.K. for temp for additional occupants. Contractor needs to extend temp fencing on northwest corner of building. Keep all public activity separated from construction activity and debris.
12/26/2007 ENGINEERING - FINAL Cancelled Met on site with Dave site super, Contractor wants to move in 40 people. Contractor will needs to:
1- Provide parking for 40 people.
2- Provide safe access into building.
3- Complete all ashpalt work.
4- Separate all construction activity and debris from public access.
Inspection re-scheduled for 12.27.07 in PM.
12/24/2007 ENGINEERING - FINAL Partial Approval OK FOR TEMPORARY C OF O FOR NO GREATER THAN 19 OCCUPANTS.
RE-INSPECTION BEFORE ADDITIONAL OCCUPANCY SCHEDULED FOR WEDNESDAY 12-26-07
12/21/2007 ENGINEERING - FINAL Not ready for Inspection O.K. to stock offices. NO PUBLIC ACCESS.

For temp C of O contractor will need to:
1- Provide temp HC parking and access.
2- Separate all construction activity and material from public access.
3- Complete all asphalt work.
4- Clean parking lot.
5- Move port-a-pottys.
6- Provide number of employees for parking.
Spoke to Dave site super in regards to.