Permit: T07CM02800

Parcel: 13613001S

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Permit Number - T07CM02800

Inspection Description - PLUMBING - GAS PRESSURE TEST

Inspection Status - Approved

Date Description Inspector Results Comments
01/28/2009 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
06/06/2008 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
TEST FOR 1 1/2" PIPING TO MAKE UP UNIT FROM EXISTING NEW ON ROOF TO NEW UNIT OK
SEE NOTES FROM 4/29/08 INSPECTION
04/29/2008 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
NEW 2 1/2" FROM METER LOCATION WITH 3/4" TO ROOF TOP FOR BREAKROOM, 1 1/2 TO (2) BAKERY OVENS, AND TIES INTO 2" EXISTING, WITH 1 1/2" FROM 2 1/2" FOR NEW MAKE UP AIR FOR DELI. 1 1/2 WILL BE CONTINUED TO NEW MAKE UP AIR UNIT AT LATER DATE. PER REDLINE ON 8 1/2 X 11 SHEET DATED 3/20/08 ENGINEER STEVEN HARDY. CONTRACTOR IS RESPONSIBLE TO MAKE TIE-INS RETEST SYSTEM PRIOR TO SW GAS TURN ON. WITH DROP TEST. CONTRACTOR TO PROVIDE CITY APPROVED REVISED PLAN WITH ACTUAL GAS ISOMETRIC OF ENTIRE GAS SYSTEM BECAUSE OF CHANGES. THIS IS AT CONTRACTOR RISK FOR APPROVAL OF PLAN AT LATER DATE.

AFTER HRS. INSP. CHK#4859
04/29/2008 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELED
02/08/2008 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
TEST ON PIPING TO PAN WASHER & FRYER ONLY
PER PLAN - STEVEN HARDY STAMPED 10/08/07 SERVING AS REDLINE OK
I CAN'T GUEST AT WHAT NEEDS INSPECTION
01/25/2008 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
(2) 3/4 GAS STUBS UP TO ABOVE WALL FOR FRYER & PAN WASHER TEST OK
01/18/2008 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
1" GAS FROM EXISTING TO NEW WATER HEATER TEST OK

T&P TO TERMINATE TO APPROVED AREA PRIOR TO ENERGIZING
01/15/2008 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
3/4" GAS FROM EXISTING 2" TO AC-20 OK
12/14/2007 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
11/28/2007 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
FROM EXISTING 2" GAS 1 1/2 TO 1ST NOW WALK IN OVER AND 1 1/4 TO SECOND RELOCATED OVEN PER REDLINE ON SITE PRESSURE TEST OK - THIS TO BE SHOWN ON REVISED APPROVED GAS PLAN.
11/27/2007 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) SHALL PROVIDE APPROVED GAS PLAN FOR ADDITIONAL FIXTURES
11/21/2007 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED