Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T07CM02800
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/28/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
06/06/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* TEST FOR 1 1/2" PIPING TO MAKE UP UNIT FROM EXISTING NEW ON ROOF TO NEW UNIT OK SEE NOTES FROM 4/29/08 INSPECTION |
|
04/29/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* NEW 2 1/2" FROM METER LOCATION WITH 3/4" TO ROOF TOP FOR BREAKROOM, 1 1/2 TO (2) BAKERY OVENS, AND TIES INTO 2" EXISTING, WITH 1 1/2" FROM 2 1/2" FOR NEW MAKE UP AIR FOR DELI. 1 1/2 WILL BE CONTINUED TO NEW MAKE UP AIR UNIT AT LATER DATE. PER REDLINE ON 8 1/2 X 11 SHEET DATED 3/20/08 ENGINEER STEVEN HARDY. CONTRACTOR IS RESPONSIBLE TO MAKE TIE-INS RETEST SYSTEM PRIOR TO SW GAS TURN ON. WITH DROP TEST. CONTRACTOR TO PROVIDE CITY APPROVED REVISED PLAN WITH ACTUAL GAS ISOMETRIC OF ENTIRE GAS SYSTEM BECAUSE OF CHANGES. THIS IS AT CONTRACTOR RISK FOR APPROVAL OF PLAN AT LATER DATE. AFTER HRS. INSP. CHK#4859 |
|
04/29/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
02/08/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* TEST ON PIPING TO PAN WASHER & FRYER ONLY PER PLAN - STEVEN HARDY STAMPED 10/08/07 SERVING AS REDLINE OK I CAN'T GUEST AT WHAT NEEDS INSPECTION |
|
01/25/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* (2) 3/4 GAS STUBS UP TO ABOVE WALL FOR FRYER & PAN WASHER TEST OK |
|
01/18/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1" GAS FROM EXISTING TO NEW WATER HEATER TEST OK T&P TO TERMINATE TO APPROVED AREA PRIOR TO ENERGIZING |
|
01/15/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 3/4" GAS FROM EXISTING 2" TO AC-20 OK |
|
12/14/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
11/28/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* FROM EXISTING 2" GAS 1 1/2 TO 1ST NOW WALK IN OVER AND 1 1/4 TO SECOND RELOCATED OVEN PER REDLINE ON SITE PRESSURE TEST OK - THIS TO BE SHOWN ON REVISED APPROVED GAS PLAN. |
|
11/27/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE APPROVED GAS PLAN FOR ADDITIONAL FIXTURES |
|
11/21/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |