Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2008 | ENGINEERING - FINAL | Approved | APPROVED FROM OFFICE ON DAY OFF | |
| 03/13/2008 | ENGINEERING - FINAL | Partial Approval | NO CONCERNS FOR C OF O ON FIRST FLOOR | |
| 03/11/2008 | ENGINEERING - FINAL | Partial Approval | CHECKED THE SITE AT 12:30, NO ONE ON SITE AT THIS TIME. CONTACTED MIKE AT 275-0423 HE ADVISED THAT HE WAS SEEKING A TEMPORARY C OF O FOR THIS SITE AT THIS TIME. A PARTIAL HAS ALREADY BEEN GIVEN TO THIS SITE BY NICHOLE KALAHAR-ZORMEIER SINCE 1/10/08, ADVISED MIKE THAT I WILL APPROVE THE SAME THING AT THIS TIME. HE WILL BE CALLING IN FOR A NOTHER INSPECTION FOR THE 2ND FLOOR LATER ON THIS WEEK OR FIRST OF NEXT WEEK. THIS SITE IS ACCEPTABLE AT THIS TIME FOR A TEMPORARY C OF O. | |
| 03/10/2008 | ENGINEERING - FINAL | Partial Approval | SITE PLANS AND PERSONNEL NOT AVAILABLE FOR THIS INSPECTION, SITE TO BE RECHECKED IN THE MORNING. | |
| 03/07/2008 | ENGINEERING - FINAL | Partial Approval | TALKED TO MIKE AT 275-0423 SITE VISIT YESTERDAY SITE STILL OKAY FOR CONTINUED TEMP |
|
| 03/04/2008 | ENGINEERING - FINAL | Partial Approval | SITE STILL OKAY FOR TEMP WORK STILL CONTINUING INSIDE BUILDING SOME GENERAL CLEAN UP IN THE PARKING AREA REQUIRED 8 H/C PARKING SIGNS ARE MISSING GRADING PERMIT FOR NEW SOLAR FIELD NOT YET RECEIVED |
|
| 01/10/2008 | ENGINEERING - FINAL | Partial Approval | THIS INSPECTION IS FOR THE NORTH 1/2 OF THE FIRST FLOOR *DELINEATE AND SEPARATE ALL CONSTRUCTION TRAFFIC FROM EMPLOYEE PARKING AND BUILDING ACCESS-SIGNS, CAUTION TAPE, FENCING, ETC *4 H/C PARKING SPACES HAVE BEEN ADDED FOR AT LEAST THE TEMPORARY EMPLOYEE PARKING AREA-STRIPING TO ROUTE FROM ACCESS ISLES TO THE RAMP LOCATION FOR TEMPORARY EMPLOYEE ACCESS |