Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2009 | PLUMBING - INTERMEDIATE | Approved | ||
| 04/24/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 04/16/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* DOOR LOCKED NO ACCESS |
|
| 01/23/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* BACKFLOW DEVICE MOVED UP TO BUILDING OK CONNECTION AT METER AND UNDERGROUND OK OK TO COVER |
|
| 01/12/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK TO COVER WALLS EXCEPT AT E.W.C PROVIDE CUT SHEET FOR ROUGH-IN ELEVATIONS TO ENSURE PROPER INSTALLATION 2. PROVIDE STAMPED LETTER DELETING MOP SINK AND CAP OFF IN WALL 3. STILL NEED TO SEE CLOSET FLANGE |
|
| 12/19/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. STILL NOT INSTALLED PER PLAN 2. THE APPROVED PLAN NEEDS TO BE REFLECTIVE OF THE INSTALLATION 3. NO TRAPS IN WALL 4. NO N/H BAND ON ABS 5. BANG PLATES |
|
| 12/09/2008 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* CONTRACTOR TO PAY REINSPECTION FEE 1. REMOVE PVC TO ABS CONNECTION ON 2ND LEVEL & PROVIDE CORRECT PERM. CAP 2. INSTALL PER APPROVED PLAN & HAVE REVISED PLAN PLAN CHECKED AND APPROVED BY THIRD PARTY 3. PROVIDE APPROVED MATERIALS & METHODS FOR ALL PIPING HANGERS AND SECURING OF PIPING 4. PROVIDE CLEANOUTS AS REQUIRED BY 2006 UPC 5. ALL PIPING TO HAVE TEST IN PLACE AT INSPECTION TIME LIST NOT COMPLETE HAVE YOUR PLUMBER ON SITE FOR NEXT INSPECTION |
|
| 11/20/2008 | PLUMBING - INTERMEDIATE | Cancelled | ||
| 10/29/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* COMPLETE LIST FROM 10/15/08 ALL OF LIST BEFORE CALLING FOR INSPECTION. |
|
| 10/20/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NO CHANGE FROM LAST INSPECTION |
|
| 10/15/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NOT INSTALLED PER PLAN NO REDLINES ON SITE PLEASE NOTE: 1. ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES THEN NO MORE THAN FOUR FEET BETWEEN HANGERS 2. PLUMBERS TAPE NOT APPROVED LISTED MATERIAL 3. FHA STRAPS & NAIL GUARDS 4. ALL PIPING TO BE TESTED 5. ALL STUB OUTS TO BE PROPERLY SUPPORTED 6. ALL WATER PIPE SIZES TO MATCH ISOMETRIC CONTINUED "NOT READY" MAY RESULT IN REINSPECTION FEE |