Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/01/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PROVIDE CLAMP FOR HIGH LOOP ON DISHWASHER DRAIN HOSE. SEE ALL NOTES FROM ABOVE. |
|
| 03/27/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE A CLEAN BACTERIA REPORT FOR POTABLE WATER IN BUILDING 2. COMPLETE CORRECT INSTALL OF DISHWASHER MACHINE 3. COMPLETE ALL PLUMBING INSTALLS 4. PROVIDE WATER HAMMER ARRESTORS FOR DISHWASHER AND WASHING MACHINE WATER SUPPLIES 5. PROVIDE CRITICAL LEVEL AT URINAL FLUSH VALVE VACUUM BREAKER 6. PROVIDE MIXING VALVE AT PUBLIC USE LAV 7. SECURE AND MAKE SERVICE SINK WATER TIGHT 8. COMPLETE INSULATION 9. SEAL ALL PIPE PENETRATIONS IN/OUT OF BUILDING |