Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
Permit Number - T07CM00943
Inspection Description - ELECTRIC - CONSTRUCTION POWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2008 | ELECTRIC - CONSTRUCTION POWER | Approved | IVRS - Inspection :* | |
02/08/2008 | ELECTRIC - CONSTRUCTION POWER | Partial Approval | IVRS - Inspection :* | |
01/15/2008 | ELECTRIC - CONSTRUCTION POWER | Partial Approval | IVRS - Inspection :* 1) ELECTRICAL CONTRACTOR TO ENSURE ELECTRICAL EQUIPMENT IS LOCKED OUT AND RESTRICTED FROM UNAUTHORIZED PERSONE. PRIOR TO ENERGIZING PANEL ? NEED TO HAVE INSPECTION RTU'S FOR GYM ARE ALL THAT ALLOWED TO BE ENERGIZED 2) RECEIVED LETTER OF TORQUE |
|
01/14/2008 | ELECTRIC - CONSTRUCTION POWER | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BOND METAL NIPPLES ENTERING BOTTOM OF SES NEC 250.92 2. BONDING BUSHINGS ON RTU'S |
|
01/07/2008 | ELECTRIC - CONSTRUCTION POWER | Not ready for Inspection | IVRS - Inspection :* 1. INSTALL SECONDARY CONDUCTORS FROM SES TO TEP XFMR 2. POST BOND FOR TEMP POWER 3. PROVIDE LETTER OF TORQUE 4. PROVIDE LOCK OUT FOR CIRCUITS NOT TO BE ENERGIZED AND RESTRICT ACCESS TO PANELS TO QUALIFIED PERSONS ONLY 5. INSTALL CONDUCTORS TO RTU'S TO BE ENERGIZED 6. BOND SPRINKLER PIPING |