Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit: T07CM00918

Parcel: 114600270

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
03/21/2008 ENGINEERING - FINAL Approved APPROVED ON CONDITION, NO OTHER C OF O'S WILL BE GRANTED UNTIL FINAL GRADING INSPECTION APPROVAL.
Tanque Verde Place
T04BU02272
Preliminary Grading Punch list
March 20, 2008

The following item must be completed prior to final approval of the grading permit and Certificate of Occupancy for lots 9, 10, 32-37 AND ALL LOTS OUTSTANDING.

1. Construct all sidewalks as shown on the approved plans.
2. Construct all sidewalk scuppers per approved plans.
3. Construct drainage swale behind lots 44-47 per plan.
4. Clean drainage pipe behind lots 28, 29.
5. Grout rip rap outfalls per approved plan.
6. Install concrete gutters or revise plan.
7. Revise the grading plan per red line drawings.
8. Install stop signs per plan.
9. Expose all storm drain manhole covers.
10. Submit an Engineers certification for lots 1-14.
11. Repair/ replace all broken or damaged sidewalk and ramps that have two or more through cracks per panel.
12. Trim basin and swale slopes to match plan grades and cross section.
13. Show slope grades at southeast side of lot 57. Slopes steeper then 2:1 require grouted rip rap.
14. Covered parking canopies extend 1 foot into the required PAAL. Have Engineer address with Zoning.
15. Provide detail for both type I and II bicycle parking, and provide lighting as noted on approved plan.
16. Show location of all handrails on as-built plan.
17. Provide inlet and outlet flow line elevation for all underground pipe.
18. Provide detail for drainage swale along west edge of property. Sidewalk/porch extends into area for swale.
19. Insure a minimum of 4 ft sidewalk clearance at building pop outs, electrical panels, etc.
20. Insure a minimum 24 ft PAAL at lot 2.
21. Insure water does not pond at all curb ramps.
22. Provide type B post barricades in trash enclosures per approved plan.

Please address above items and call for reinspection.
01/18/2008 ENGINEERING - FINAL Partial Approval OK FOR TEMPORARY C OF O.
COMPLETE ITEMS 1,2,3,5 AND 7 THAT ARE IN PROGRESS.
ALL ITEMS MUST BE COMPLETED FOR A PERMANENT C OF O.
01/16/2008 ENGINEERING - FINAL Denied 1. MODIFY THE ROOF DRAINAGE OUTLET AT THE NE CORNER OF THE BUILDING TO PREVENT RAINWATER DISCHARGE TO THE SIDEWALK.
2. MODIFY THE SITE PLAN TO SHOW DRAINAGE SWALE WEST OF THE BUILDING. ALSO PROVIDE APPROVED GRADING AND DEVELOPMENT PLAN REVISIONS.
3. PROVIDE POSITIVE RAINWATER DRAINAGE TO THE SITE DRAINAGE IMPROVEMENTS. THE DRAINAGE MUST NOT FLOW ONTO THE ADJACENT PROPERTY TO THE WEST.
4. FILL IN VOIDS BETWEEN SIDEWALK/CURBS AT THE SIDEWALK SCUPPERS.
5. REPAIR ASPHALT TO ELIMINATE LOW AREAS AND PONDING WATER.
6. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
7. PROVIDE A 2' EXISTING ELEVATION BENCH AT WESTERN PROPERTY LINE.